01 August, 2016

01.08.2016

 Boiler: View from North East
  Boiler: View from South East
  Boiler: Cavity: furnace girders & Backpass 
 Boiler Furnace hangers / piping
 Boiler Backpass: hangers, headers, roof panel
 Turbine Hall general view: 4 roff trusses / 3 bays in preparation of overhead crane erection 
  Turbine Hall : View from South side
  Turbine Hall : View from Boiler side
 Turbine Hall : View from North
 Turbine Hall: Turbine Table columns from North
 Turbine Hall general view: 4 roff trusses / 3 bays in preparation of overhead crane erection 
Turbine Hall: Turbine Table columns from North
 Turbine Hall : B95, polishing plant pedestals & bolts
 B30: Central Electrical building, Ground Floor first columns casted
  SST Transformer fondations
B35: Boiler Electrical Building fondations & backfilling
 B35: Boiler Electrical Building Cable duct
ESP : View from North: pedestals + pile breacking for DEPAC
 ESP : View from North: pedestals + pile breacking for DEPAC
 WFGD: West side fondation: pump building in front, back : FGD duct
  WFGD: Pump building pile breacking, fondations preparation
 WFGD: Pile breacking started on WFGD sercice building (L07)
 WFGD: Access preparation for Absorber erection start
  WFGD: Absorber erection start for embeeded ring (shims)
 Chimney stack: intermediate floors erection prior to Flue duct erection
 Chimney stack: intermediate floors erection prior to Flue duct erection
 Chimney stack: intermediate floors erection prior to Flue duct erection
 Cooling Tower: Cooling water pipes North side

Cooling Tower: Cooling water pipes South side
UG water tanks & Fire figthing pump station fondations