16 August, 2016

16.08.16

Boiler & STH Overall View to East
Boiler Pressure Part-upper backpass rearwall panels (S20U) lifting
Boiler Pressure Part-upper backpass rearwall panels (S20U) lifting
Boiler Pressure Part-upper backpass rearwall panels (S20U) lifting
Boiler Pressure Part-upper backpass rearwall panels (S20U) lifting
PA & FD Fan foundations North
 B63 STH/B64 STG View to North - Preparation for OH Crane installation
 B63 STH/B64 STG View to North 
 B95 Polishing Plant backfill view to North
 OH Crane for STH ground assembly area
 OH Crane for STH preparation for lifting 
 B63 STH View to South
 B63 STH Internal Steel Structure North in progress
 B64 STG Table Top soffit in progress
 B30 CEB View to South - First floor in progress
 B35 BEB View to West - Cable Duct backfilling 
 H02 Underground Electrical Network south of F05 HV Switchyard
 H03 - Pipe Rack Steel Structure view to West
B07 ESP Area North - DEPAC Foundations in Progress
B07 ESP Area South - DEPAC Foundations completed

WFGD - Recycle piping & pumps foundations
WFGD -  Forced Oxidation Air Blower Foundation
WFGD - L47 - Service Water Pit 
WFGD - L07 - Service Bldg pile cutting
WFGD fabrication tables for duct pre-assembly 
WFGD - Booster Fans Foundations 
WFGD -  Booster Fans Foundations
 WFGD foundations for Duct 2 & 4
 G42 Make up underground Tank View to North
CW Pipes to Pump Station 
E04 Cooling Tower View to East
E07 EB for Cooling Tower columns in progress