31 October, 2016

31.10.16

  Boiler Pressure Part installation
 Boiler Pressure Part installation - Furnace 
  Boiler Pressure Part installation - Backpass
 FW Tank preparation for lifting

 B64 STG foundation, condenser side soffitt stripped
 B63 STH Offloading bay
 B63 STH GL 1-2 Slab in progress
 B63 STH GL 2-3 Undergrounds in progress
 B63 STH GL 3-4 Area in progress
 B63 STH GL 4-5 Area in progress
 B30 CEB Cable Trays installation
 B30 CEB View to North
 B35 BEB View to West Ground Beams in progress
 B35 BEB View to East Ground Beams in progress
B68 GSUT Transformers Foundations
 ESP Steel Structure Installation 
 ESP Hoppers Ground Fabrication Area
  B10 ID Fans Foundation View to North
 B10 ID Fans Foundation View to South
 WFGD Ductworks
 WFGD L07 Service Bldg  foundations View to North
 WFGD L04 Pumps Bldg foundations View to West 
 Stack Steel liners installation 
 Stack Steel liners installation
 E06 CW Filtration bldg foundation
 E04 Cooling Tower View to East
 D20 Fly Ahs compressor Bldg Foundation View to West
 H03 Overview to West of  Pipe Rack steel
 H03 Piper Rack BOP Piping installation

28 October, 2016

28.10.16 Aerial October end

 General Overview, MMO all Units
 Overview MMO, Plant + Laydowns
 Overview Power Block from South West
  Overview Power Block from South West
  Overview Power Block from North West
  Overview Power Block from West
  Sky View Power Block: Trafos, CEB, Turbine Hall, Boiler, ESP
 Sky View Back end: Boiler, ESP, WFGD
 ESP, Boiler View from North East
 Boiler side view from North
 Boiler side view from North: PA/FD fan foundations, BEB
 Boiler Side View from South
  Boiler Side View from South : Cavity & Back Pass entrances
  Boiler Side View from South : PA/FD fans
 Turbine Hall from North
 Turbine Hall from North: +14 m level : Turbine Table
 Turbine Hall From West
 Turbine Hall From West: Turbine Table side View
 Turbine Hall from South West
 Turbine Hall from South 
 Turbine Hall from South : +14 m level: Turbine Table
Boiler Electrical Building: 60 % Tie Beams casted on 26th Oct
Central Electrical Building: Soffit 3rd Level on going (+11.50 m)
Central Electrical Building: Soffit 3rd Level on going (+11.50 m)
Central Electrical Building: plan to cast half slab on 31st oct
Bird View of CEB, Trafos & Switch Yard
GSUT Transformer foundations
Switch Yard & SST Transformers fondations
Condenser necks under welding
ESP area: ID Fans & WFGD absorber ring
WFGD area