13 March, 2018

13-03-18

Plant view from South-West side
B63 - STH view from South-East side
B63 - STH West side staircase structure erection activities
B63 - STH view from North side
B63 - STH North side civil work activities
Steam Blow silencer equipment erection activities
Steam Blow pipe erection activities
B63 - STH area Elev. +14.00 m view from East side
B64 - ST turbine area steam blow pipe erection activities
B64 - ST turbine area steam blow pipe erection activities
B64 - ST turbine area steam blow pipe insulation installation
B64 - ST turbine crossover pipe insulation installation
B64 - ST turbine crossover pipe insulation installation
B64 - ST turbine valve insulation installation
B64 - ST turbine valve insulation installation
B64 - ST turbine valve insulation installation
B64 - Generator South-East area steam blow pipe erection activities
B64 - Generator South-East area steam blow pipe erection activities
B64 - STH loading bay area steam blow pipe erection activities
B64 - STH loading bay area steam blow pipe erection activities
B64 - STH BFWP area steam blow pipe erection activities
B63 - STH HP BIS Heaters insulation installation
B63 - STH pipe erection activities
B63 - STH pipe valve insulation installation
B63 - STH pipe insulation installation
B63 - STH HP Heaters area view
B63 - STH MDFWP coupling shaft installation
B01 - Boiler area view from South-East side
B01 - Boiler South FD & PA Fans area view
B01 - Boiler North FD & PA Fans area view
B01 - Boiler Seal Air Fans & Submerged Scrapper Conveyor view from South side
B01 - Boiler Submerged Scrapper Conveyor view from South-East side
B06 - Boiler Coal Bunker Station view from South side
B06 - Boiler Coal Bunker Station view from North side
B06 - Boiler Coal Bunker Station Pulverizer equipment view
B30 - CEB Electrical Bldg. external lighting installation
B30 - CEB Electrical Bldg. main control room view
B30 - CEB Electrical Bldg. meeting room view
B30 - CEB Electrical Bldg. entrance area view
B30 - CEB Electrical Bldg. server room view
B30 - CEB Electrical Bldg. balcony area view
B30 - CEB Electrical Bldg. pantry room view
B68 - Transformer North area civil work activities
F05 - HV 230 kV Switchyard area view from B30 - CEB Electrical Bldg.
B95 - Condensate Polishing Plant area view from South-West side
B07 - ESP area view from South-East side
B07 - ESP 1 view from North side
B07 - ESP 2 view from South side
B17 - Flue Gas Ducts connection to B07 - ESP 2 erection activities
B17 - Flue Gas Ducts towards B10 - Boiler ID Fan B ducts insulation installation
WFGD area view from South-East side
WFGD area view from East side
WFGD area view from North side
L04 - WFGD Pump Bldg. wall cladding installation
L04 - WFGD Pump Bldg. wall cladding installation
L04 - WFGD Pump Bldg. pumps commissioning activities
L04 - WFGD Pump Bldg. and L38 - Local Gypsum Slurry Tank area view from South-East side
L05 - WFGD Absorber / Reactor Tower wall insulation & cladding erection activities
L06 - WFGD Electrical Bldg. view from South-West side
L06 - WFGD Electrical Bldg. view from North-West side
L07 - WFGD Service Bldg. tanks area view
L07 - WFGD Service Bldg. gypsum storage foundation area
L09 - WFGD Auxiliary Storage Tank blasting & lining activities
L10 - WFGD Booster Fans area cable pulling activities
L24 - WFGD Ducts view from South-East side
L36 - WFGD SRS. Bldg. and Service Bldg. area view from South-East side
C01 - Fuel Oil Storage Tank view from B30 - CEB Electrical Bldg.
G10 - Emergency Diesel Generator area view from B30 - CEB Electrical Bldg.
C03 - Fuel Oil Pumping Station view from North side
C03 - Fuel Oil Pumping Station pump equipment view
Auxiliary Steam piperack crossing view from South side
Auxiliary Steam piperack crossing view from East side
G11 - Boiler Firefighting Pump House area view from West side
G11 - Boiler Firefighting Pump House view from West side
G11 - Boiler Firefighting Pump House equipment installation
G11 - Boiler Firefighting Pump House pipe hydrotest activities
G32 - Neutralization Basin area view from North-West side
G60 - Chemical Bulk Storage Bldg. civil work activities
B94 - Air Preheaters Washing Basin area view from South-East side
D01 - Fly Ash Silo Storage Tank erection activities
D01 - Fly Ash Silo Storage Tank erection activities
D06 - Ash Transfer Tower and D07 - Ash Slag Conveyors structure erection activities
D06 - Ash Transfer Tower structure erection activities
D06 - Ash Transfer Tower module erection activities
D23 - Ash Receiving Station view from South-West side
D30 - Ash Loading Station view from North-West side
D30 - Ash Loading Station view from East side
D08 - Fly Ash Sub-Distribution Bldg. view from South-West side
C06 - Coal Conveyors and H03 - Piperack view from South-East side
L15 - Gypsum Transfer Tower view from East side
H03 - Piperack towards B07 - ESP 1 area civil work activities
G42 - Fire Fighting Pumping Station view from South-East side
K4 - Guard House civil work activities
Plant South side of Transformer area road work activities
Plant South side of STH area road work activities
Plant South side of Boiler area road work activities
Plant South side of Boiler area road work activities
Plant South side of ESP area road work activities
Plant South side of ESP area road work activities
Plant South side of WFGD area road work activities
Plant South side of WFGD area road work activities
Plant South side of Cooling Tower area drainage work activities
Plant North side of Cooling Tower area road work activities
Plant East side of WFGD area road work activities
Plant South side of WFGD area road work activities
Plant South side of Cooling Tower area road work activities
Plant East side of WFGD area drainage work activities
Plant North side of ESP area drainage civil work activities
Plant North side of ESP area underground civil work activities
Plant North side of ESP area underground fire fighting pipe installation
Plant North side of ESP area underground fire fighting pipe installation

No comments:

Post a Comment