26 March, 2018

26-03-18

Plant view from North-West side
Plant view from South-West side
Plant view from South-East side
B63 - STH West side staircase structure erection activities
B63 - STH North side civil work activities
B63 - STH West side of G28 - Oil & Fire Fighting Water Recovery Pit pipe erection activities
B64 - ST turbine loading bay area steam blow pipe view
B63 - STH turbine Feedwater Tank area view
B64 - ST turbine area view from North side
B64 - ST turbine area steam blow pipe view
B64 - Generator area view from South side
B64 - STH BFWP area steam blow pipe view
B63 - STH HP BIS Heaters insulation installation
B63 - STH HP BIS Heaters insulation installation
B63 - STH Feedwater Tank insulation installation
B63 - STH MDFWP pump view
B63 - STH MDFWP coupling alignment activities
B63 - STH MDFWP coupling alignment activities
B63 - STH Excitation Transformer area view
B63 - STH Voltage surge protection cubical view
B01 - Boiler view from South-East side
B01 - Boiler South FD & PA Fans area view
B01 - Boiler North FD & PA Fans area view
B01 - Boiler Submerged Scrapper Conveyor area view
B01 - Boiler Slag Conveyor chute area view
B01 - Boiler Slag Conveyor towards D06 - Ash Transfer Tower belt installation
B01 - Boiler Seal Air Fans pipe insulation & cladding erection activities
B02 - Stack CEMS view from East side
B06 - Boiler Coal Bunker view from South side
B07 - ESP area view from South-East side
B07 - ESP 1 view from North side
B07 - ESP 2 outlet duct towards B10 - ID Fan B duct insulation installation
B07 - ESP 2 view from South side
B17 - Flue Gas Duct towards B07 - ESP 1 view from North-West side
B17 - Flue Gas Duct towards B07 - ESP 2 insulation installation
B17 - Flue Gas Duct South side cable tray erection activities
B95 - Condensate Polishing Plant view from South side
F05 - HV 230 kV Switchyard area view from B30 - CEB Electrical Bldg.
WFGD area view from South-East side
WFGD area view from South-West side
WFGD area view from East side
WFGD area view from North side
L04 - WFGD Pump Bldg. wall cladding installation
L04 - WFGD Pump Bldg. view from West side
L04 - WFGD Pump Bldg. wall cladding installation
L05 - WFGD Absorber / Reactor Tower view from East side
L05 - WFGD Absorber / Reactor Tower insulation & cladding installation
L05 - WFGD Absorber / Reactor Tower area pipe erection activities
L05 - WFGD Absorber / Reactor Tower elevator structure area view
L06 - WFGD Electrical Bldg. view from South-West side
L06 - WFGD Electrical Bldg. transformer commissioning activities
L07 - WFGD Service Bldg. entrance area civil work activities
L07 - WFGD Service Bldg. gypsum storage foundation area view
L07 - WFGD Service Bldg. tank area view
L09 - WFGD Auxiliary Storage Tank area view from East side
L10 - WFGD Booster Fans area view from West side
L24 - WFGD Ducts view from South-East side
L24 - WFGD Ducts GGH Sealing Gas Fan pipe erection activities
L24 - WFGD Ducts pit area cable pulling activities
L36 - WFGD SRS Bldg. area view from South-West side
L37 - WFGD Purge Tank area view from North side
L38 - Local Slurry Gypsum Tank area view from South side
G11 - Boiler Firefighting Pump House view from South side
G11 - Boiler Firefighting Pump House area view from North side
G28 - Oil & Fire Fighting Water Recovery Pit pipe erection activities
G60 - Chemical Bulk Storage Bldg. civil work activities
B94 - Air Preheaters Washing Basin area view from South-East side
D01 - Fly Ash Silo Storage Tank erection activities
D06 - Ash Transfer Tower structure erection activities
D08 - Ash Sub-Distribution Bldg. area view from South-East side
C06 - Coal Conveyors and H03 - Piperack view from South-East side
C08 - Lignite Sub-Distribution Bldg. area view from South-West side
C07 - Transfer Tower #3 equipment installation
L12 - Gypsum Conveyors erection activities
L15 - Gypsum Transfer Tower structure erection activities
H03 - Piperack towards B07 - ESP 1 area view from North side
G42 - Fire Fighting Pumping Station view from South-East side
G42 - Fire Fighting Pumping Station equipment view
G42 - Fire Fighting Pumping Station wall ventilation installation
G42 - Fire Fighting Pumping Station pumps view
E04 - Cooling Tower view from South-West side
K4 - Guard House civil work activities
Plant North side of Switchyard area civil work activities
Plant South side of Boiler area road work activities
Plant South side of Boiler area road work activities
Plant South side of Boiler Fan area road work activities
Plant South side of ESP area road work activities
Plant South side of ESP area road work activities
Plant South side of ESP area road work activities
Plant South side of Stack area road work activities
Plant South side of WFGD area road work activities
Plant South side of WFGD area road work activities
Plant South side of Cooling Tower area drainage work activities
Plant South side of Cooling Water Treatment Bldg. area drainage work activities
Plant West side of Fire Fighting Pump Station area drainage work activities
Plant North side of Cooling Tower area drainage work activities
Plant East side of WFGD area drainage work activities
Plant  West side of WFGD area drainage work activities
Plant North side of ESP area underground fire fighting pipe installation
Plant North side of ESP area underground fire fighting pipe installation
Plant North side of Boiler area drainage work activities