B63 - STH West side staircase structure erection activities
B63 - STH view from South-East side
B63 - STH North side civil work activities
B63 - STH West side G28 - Oil & Fire Fighting Recovery Pit area view
B63 - STH turbine area view
B64 - ST turbine view from North-West side
B64 - ST turbine crossover pipe insulation installation
B64 - ST turbine valve & crossover pipe insulation installation
B64 - ST turbine area steam blow pipe insulation installation
B64 - ST turbine area steam blow pipe insulation installation
B64 - ST turbine area steam blow pipe insulation installation
B64 - ST turbine area steam blow pipe insulation installation
B64 - ST turbine area steam blow pipe insulation installation
B64 - ST turbine area steam blow pipe insulation installation
B64 - STH BFWP area steam blow pipe insulation installation
B64 - STH loading bay area steam blow pipe erection & insulation activities
Steam Blow silencer equipment & pipe erection activities
B64 - Generator area view from South side
B63 - STH Feedwater Tank insulation installation
B63 - STH HP BIS Heaters insulation installation
B63 - STH MDFWP pump view
B01 - Boiler South FD & PA Fans area view
B01 - Boiler North FD & PA Fans area view
B07 - ESP area view from South-East side
B07 - ESP 1 view from North side
B07 - ESP 2 view from South side
WFGD area view from North side
WFGD area view from East side
L04 - WFGD Pump Bldg. wall cladding installation
L05 - WFGD Absorber / Reactor Tower and L38 - Local Gypsum Slurry Tank view from East side
L05 - WFGD Absorber / Reactor Tower insulation & cladding installation
L06 - WFGD Electrical Bldg. view from South-West side
L07 - WFGD Service Bldg. Gypsum discharge conveyor view
L07 - WFGD Service Bldg. Gypsum discharge conveyor belt installation
L09 - WFGD Auxiliary Storage Tank lamination installation
L24 - WFGD Ducts view from South-East side
L15 - Gypsum Transfer Tower discharge conveyors towards L07 - WFGD Service Bldg.view
L15 - Gypsum Transfer Tower discharge conveyors towards L07 - WFGD Service Bldg. erection activities
L15 - Gypsum Transfer Tower view from East side
L12 - Gypsum conveyors towards L15 - Gypsum Transfer Tower erection activities
G11 - Boiler Firefighting Pump House view from West side
G60 - Chemical Bulk Storage Bldg. civil work activities
B94 - Air Preheaters Washing Basin area view from South-East side
D06 - Ash Transfer Tower and C06 - Coal Conveyors view from B63 - STH
C06 - Coal Conveyors and H03 - Piperack view from South-East side
D01 - Fly Ash Silo Storage Tank erection activities
D06 - Ash Transfer Tower and D07 - Slag Conveyors view from B63 - STH
D06 - Ash Transfer Tower structure erection activities
D07 - Slag Conveyors module view from B01 - Boiler
G42 - Fire Fighting Pumping Station and C07 - Transfer Tower #3 area view from East side
G42 - Fire Fighting Pumping Station and H03 - Piperack area view from South-West side
G42 - Fire Fighting Pumping Station and H03 - Piperack area view fromL07 - WFGD Service Bldg.
G42 - Fire Fighting Pumping Station equipment view
G33 - Industrial Water Recovery Pit area view from South-West side
Plant West side of CPP area civil work activities
Plant East side of Guard House area road work activities
Plant South side of Boiler area road work activities
Plant South side of Boiler ID Fans area road work activities
Plant South side of WFGD area road work activities
Plant South side of ESP area road work activities
Plant South side of Boiler area road work activities
Plant South side of WFGD area road work activities
Plant East side of WFGD area drainage work activities
Plant East side of WFGD area drainage work activities
Plant North side of Cooling Tower area drainage work activities
Plant North side of ESP area underground fire fighting pipe installation
Plant North side of ESP area underground fire fighting pipe installation
Plant North side of ESP area underground fire fighting pipe installation
Thanks For sharing this Superb blog.
ReplyDeleteIndustrial pipe insulation
Chilled Water Pipe Insulation