B63 - STH view from South-East side
B63 - STH West side staircase structure erection activities
B63 - STH North side civil work activities
B63 - STH South-West side of B95 - CPP civil work activities
B63 - STH turbine Feedwater Tank area view
B64 - ST turbine area steam blow pipe view
B64 - ST turbine area steam blow pipe insulation installation
B64 - ST turbine area steam blow pipe insulation installation
B64 - ST turbine area steam blow pipe insulation installation
B64 - ST turbine area Auxiliary steam blow pipe view
Steam Blow silencer equipment & pipe view
Auxiliary Steam Blow activities
B64 - Generator area view from South side
B64 - STH BFWP area steam blow pipe insulation installation
B64 - ST turbine view from North side
B64 - ST turbine crossover pipe insulation installation
B64 - ST turbine crossover pipe insulation installation
B64 - ST turbine valve insulation installation
B64 - ST turbine valve insulation installation
B63 - STH HP BIS Heaters insulation installation
B63 - STH Feedwater Tank insulation installation
B63 - STH MDFWP pump view
B63 - STH MDFWP pump view
B63 - STH MDFWP coupling alignment activities
B63 - STH MDFWP coupling alignment activities
B06 - Boiler Coal Bunker view from South side
D01 - Fly Ash Silo Storage Tank erection activities
D06 - Ash Transfer Tower belt & roller erection activities
D06 - Ash Transfer Tower and D07 - Slag Conveyors belt erection activities
D06 - Ash Transfer Tower and C06 - Coal Conveyors view from B63 - STH