B63 - STH area view from South-East side
B63 - STH North side cooling water pipe erection activities
B63 - STH rooftop view from B01 - Boiler
B63 - STH area Elev. +14.00 m view from West side
B63 - STH area Elev. +14.00 m view from East side
B64 - Power train area view from North side
B64 - Generator view from South-West side
B64 - BFPT piping erection activities
B64 - Power oil room view from Top (Elev. +14.00 m)
B63 - STH Excitation Transformer Cubicle room view from West side
B64 - ST LP turbine view from South-West side
B64 - Generator Busbar connection view
B64 - Generator Busducts view
B64 - CCW Inlet pipe line flange view from West side
B64 - MCW Outlet pipe line flange view from West side
B63 - STH - WSC piping erection work activities
B01 - Boiler area view from South-East side
B06 - Boiler Bunker Station area view from South side
B01 - Boiler Submerged Conveyor concrete slab work activities
 B01 - Boiler Slug Conveyor foundation civil work activities
 B01 - Boiler Submerged Conveyor base support installation activities
B01 - Boiler North side Temporary Tower crane foundation demolition activities
 
B01 - Boiler South FD Fan and PA Fan view
B01 - Boiler North FD Fan and PA Fan area platform erection activities
B01 - Ammonia De-humidification skid installation activities
B01 - Ammonia Vaporization & Dulution skid installation activities
B01 - Boiler Submerged Conveyor view
 B01 - Boiler Soot-Blower erection activities
B01 - Boiler Annubar Sleeves welding activities
 B01 - Boiler ducts lagging installation activities
B06 - Boiler Bunker Coal Conveyor area view
 B06 - Boiler Bunker Coal Conveyor area view
B07 - ESP view from South-West side
B07 - ESP and L24 - WFGD Ducts area view from South side
B17 - Flue Gas Ducts structure erection activities
 
B17 - Flue Gas Ducts pre-assembly area view from B01 - Boiler
  
B35 - BEB Electrical Bldg. South side staircase erection activities
B35 - BEB Electrical Bldg. West side area civil work activities
B68 - Transformer SST area view from B63 - STH
F05 - 230 kV Switchyard area view from B01 - Boiler
F05 - 230 kV Switchyard HV cable pulling activities
F05 - 230 kV Switchyard HV cable pulling activities
L04 - WFGD Pumping Station Bldg. view from West side
WFGD North-West side view from B01 - Boiler
WFGD South-West side view from B01 - Boiler
L24 - WFGD Ducts lagging & cladding installation activities
C01 - Fuel Oil Storage Tank and Auxiliary piperack view from B01 -Boiler
D01 - Fly Ash Silo Storage Tank and H03 - Piperack view from B01 - Boiler
C06 - Coal Conveyors and H03 - Piperack view from B01 - Boiler
C06 - Coal Conveyors and H03 - Piperack view from B01 - Boiler
C06 - Coal Conveyors module pre-assembly area view from B01 - Boiler
C07 - Coal Transfer Tower structure view from B01 - Boiler
H03 - Piperack towards B07 - ESP structure view from B01 - Boiler
H03 - Piperack towards B07 - ESP structure erection activities
H03 - Piperack towards B07 - ESP structure erection activities
G28 - Oil & F.F. Recovery Pit at West B63 - STH civil work activities
Temporary Hydro-test drain water collecting pond area view from Boiler