07 November, 2017

07-11-17

Plant view from West side
B63 - STH view from West side
B63 - STH North side cooling water pipe erection activities
B30 - CEB Electrical Bldg. view from South-West side
B30 - CEB Electrical Bldg. Programming room console installation activities
B30 - CEB Electrical Bldg. Main Control room view
B30 - CEB Electrical Bldg. elevator erection activities
B30 - CEB Electrical Bldg. meeting room view
B68 - Transformer area South side underground civil work activities
F05 - 230 kV Switchyard area view from B30 - CEB Electrical Bldg.
F05 - 230 kV Switchyard HV cable pulling activities
F05 - 230 kV Switchyard HV cable pulling activities
F05 - 230 kV Switchyard HV cable pulling activities
B07 - ESP 1 Outlet Ducts view from L05 - WFGD Absorber / Reactor Tower
B07 - ESP 2 Outlet Ducts view from L05 - WFGD Absorber / Reactor Tower
L04 - WFGD Pumping Station Bldg. view from South-East side
L04 - WFGD Pumping Station Bldg. view from L07 - WFGD Service Bldg.
 L04 - WFGD Pumping Station Bldg. view from L05 - WFGD Absorber / Reactor Tower
L05 - WFGD Absorber / Reactor Tower view from L07 - WFGD Service Bldg.
L05 - WFGD Absorber / Reactor Tower elbow view
L05 - WFGD Absorber / Reactor Tower Emergency Quenching Water Tank area view
L05 - WFGD Absorber / Reactor Tower Hydro-Cyclone equipment area view
L05 - WFGD Absorber / Reactor Tower pipe erection activities
L06 - WFGD Electrical Bldg. rooftop HVAC equipment installation activities
L06 - WFGD Electrical Bldg. view from L05 - Absorber / Reactor Tower
L07 - WFGD Service Bldg. roof sheeting erection activities
L07 - WFGD Service Bldg. Vacuum pump grouting activities
L07 - WFGD Service Bldg. conveyor installation activities
L07 - WFGD Service Bldg. conveyor installation activities
L09 - WFGD Auxiliary Storage Tank erection activities
L24 - WFGD Ducts and L09 - Auxiliary Storage Tank view from L05 - Absorber / Reactor Tower
L24 - WFGD Ducts view from L07 - Service bldg
C01 - Fuel Oil Storage Tank area view from B30 - CEB Electrical Bldg.
G42 - Fire Fighting Pumping Station and H03 - Piperack area view from L07 - WFGD Service Bldg.
E04 - Cooling Tower area view from L07 - WFGD Service Bldg.
 C06 - Coal Conveyors area view from L07 - WFGD Service Bldg.
C06 - Coal Conveyors structure erection activities
H03 - Piperack towards B07 - ESP structure erection activities
G28 - Oil & F.F. Recovery Pit at West B63 - STH civil work activities