Plant view from South-West side
Plant West side area view from B01 - Boiler
B63 - STH roof top view from B01 - Boiler
B68 - Transfomer and F05 - 230 kV HV switchyards area view from B01 - Boiler
B35 - BEB Electrical Bldg. roof top view from B01 - Boiler
B01 - Boiler Submerged Scrapper Conveyor installation activities
B01 - Boiler Slag Conveyor civil work activities
B01 - Boiler Slag Conveyor civil work activities
G11 - Boiler Fire Fighting Pumping House civil work activities
G11 - Boiler Fire Fighting Pumping House civil work activities
B01 - Boiler insulation installation activities
B01 - Boiler lighting installation activities
B06 - Boiler Coal Bunker Station conveyor foundation view
B06 - Boiler Coal Bunker Station conveyor foundation view
B07 - ESP view from B01 - Boiler
B07 - ESP view from B01 - Boiler
B07 - ESP view from D01 - Fly Ash Silo Storage Tank
B17 - Flue Gas Ducts and structure erection activities
B17 - Flue Gas Ducts view from B01 - Boiler
WFGD area view from B01 - Boiler
L04 - WFGD Pumping Bldg. West side view from B01 - Boiler
L05 - WFGD Absorber / Reactor Tower view from D01 - Fly Ash Silo Storage Tank
L05 - WFGD Absorber / Reactor Tower view from B01 - Boiler
C01 - Fuel Oil Storage Tank and Auxiliary Steam piperack crossing view from B01 - Boiler
C01 - Fuel Oil Storage Tank view from B01 - Boiler
Auxiliary Steam piperack crossing from existing EGAT plant view
D06 - Ash Transfer Tower structure and H03 - Piperack view
D06 - Ash Transfer Tower structure erection activities
D01 - Fly Ash Silo Storage Tank area view from B01 - Boiler
D01 - Fly Ash Silo Storage Tank and H03 - Piperack view from B01 - Boiler
D01 - Fly Ash Silo Storage Tank equipment installation activities
D23 - Ash Receiving Station structure erection activities
D30 - Ash Loading Station structure erection activities
B94 - Air Pre-Heater Washing Basin civil work activities
H03 - Piperack area view from B01 - Boiler 
H03 - Piperack towards B07 - ESP pipe & cable trays erection activities
H03 - Piperack pipe & cable trays erection activities
C06 - Coal Conveyors and H03 - Piperack area view from B01 - Boiler
C06 - Coal Conveyors and H03 - Piperack area view from B01 - Boiler
C06 - Coal Conveyors modules structure pre-assembly area view
C07 - Coal Transfer Tower #4 structure view from B01 - Boiler
C07 - Coal Transfer Tower #4 structure view from B01 - Boiler
G21 - NH3 Ammonia Storage Bldg. view from B01 - Boiler
K04 - Guard House foundation civil work activities
South side laydown area view from B01 - Boiler
South side laydown area view from B01 - Boiler