B63 - STH area view from North-West side
C01 - Fuel Oil Storage Tank area view from West side
B01 - Boiler area view from North-East side
B01 - Boiler Submerged Conveyor concrete slab civil work activities
B01 - Boiler cavity area drain trench civil work activities
B01 - Boiler North side Temporary Tower crane foundation demolition activities
B68 - Transformer area South side underground civil work activities
F05 - 230 kV Switchyard HV cable pulling activities
B07 - ESP area view from North-East side
WFGD area view from South-East side
WFGD area view from North side
L07 - WFGD Service Bldg. area view from North-East side
L24 - WFGD Ducts area view from South-East side
C01 - Fuel Oil Storage Tank area fencing erection activities
C01 - Fuel Oil Storage Tank area civil drain work & piping erection activities
C03 - Fuel Oil Pump Station view from North side
C03 - Fuel Oil Pump Station area drain trench civil work activities
G08 - Compressor Air Bldg. area fencing erection activities
D01 - Fly Ash Silo Storage Tank and D09 - Weighing Bridge area view from North-East side
D01 - Fly Ash Silo Storage Tank area view from East side
Ash Slug Conveyor area drain trench civil work activities
D06 - Ash Transfer Tower foundation area view from North-West
D06 - Ash Transfer Tower foundation area view from West side
D23 - Ash Receiving Station foundation area view
Temporary back-filling for Coal Conveyors module erection area view
Temporary back-filling for Coal Conveyors module erection area view
D08 - Fly Ash Sub-Distribution Bldg. area view from South-West side
D08 - Fly Ash Sub-Distribution Bldg. internal area view
C06 - Coal Conveyors structure and D20 - Fly Ash Comp. Air Bldg. area view from West side
C06 - Coal Conveyors structure and D20 - Fly Ash Comp. Air Bldg. area view from East side
C06 - Coal Conveyor structure pre-assembly activities
C06 - Coal Conveyors area view from West side
G33 - Used Water Reservoir and C07 - Coal Transfer Tower area view from South-East side
H03 - Piperack area cable pulling activities
H03 - Piperack area view from East side
Used water discharge pipe erection activities
Used water discharge pipe erection activities
Auxiliary Steam piperack crossing from existing EGAT plant view