08 November, 2017

08-11-17

Plant view from South-West side
B63 - STH North side cooling water pipe erection activities
B63 - STH area Elev. +14.00 m view from East side
B63 - STH Loading Bay area view
B64 - BFWP view from Top (Elev. +14.00 m)
B64 - Power oil room view from Top (Elev. +14.00 m)
B64 - BFPT piping erection activities
B64 - Power train area view from North side
B64 - ST turbine view from North-West side
B64 - ST LP turbine view from South-West side
B64 - Generator view from South-East side
B64 -BFWP 2 Oil Skid and pipe erection activities
B63 - STH Ball Injection Skid view
B63 - STH Cooling Water Inlet pipe erection activities
B63 - STH Cooling Water Inlet pipe erection activities
B63 - STH Basement Floor Washing Pit view
B63 - STH Basement Cold Drains Pit view
B63 - STH Basement  Cold Drain Pit pump installation activities
B63 - STH Condensate Extraction system area view
B63 - STH - WSC piping erection work activities
B63 - STH - WSC piping erection work activities
B63 - STH H2 Separator Skid view
 B63 - STH Excitation Transformer room view
B63 - STH South side Fire Fighting pipe erection activities
B63 - STH Generator Busduct view
B63 - STH LP Heater Drum insulation support erection activities
G28 - Oil & F.F. Recovery Pit at West B63 - STH civil work activities
B68 - Transformer area South side underground civil work activities
 F05 - 230 kV Switchyard view from South side
B01 - Boiler North FD Fan and PA Fan view
B06 - Boiler Bunker Station area view from North side
B01 - Boiler Submerged Conveyor base support installation activities
B01 - Boiler ground level concrete slab work activities
B01 - Boiler North side backfilling civil work activities
B01 - Boiler Slug Conveyor foundation civil work activities
B01 - Boiler Coal Mill area Fire Fighting pipe erection work activities
B35 - BEB Electrical Bldg. West side area civil work activities
B35 - BEB Electrical Bldg. panels view
B35 - BEB Electrical Bldg. Marshaling panels view
B35 - BEB Electrical Bldg. Marshaling cabling activities
B17 - Flue Gas Ducts structure erection activities
B17 - Flue Gas Ducts structure erection activities
H03 - Piperack towards B07 - ESP view
H03 - Piperack towards B07 - ESP view
C06 - Coal Conveyors and H03 - Piperack view from B63 - STH
D01 - Fly Ash Silo Storage Tank and D09 - Weighing Bridge area view from North-East side
D23 - Ash Receiving Station foundation area view
Auxiliary Steam piperack crossing from existing EGAT plant view
Temporary back-filling for Coal Conveyors module erection area view
K04 - Guard House foundation civil work activities