 Power Plant overview from North-East side
B63 - STH area view from South-West side 
B63 - STH area view from South side
B63 - STH view from West side
B63 - STH North side cooling water pipe erection activities
B63 - STH North side underground pipe erection activities
B63 - STH area Elev. +14.00 m view from West side
 B63 - STH area Elev. +14.00 m view from East side
 B63 - STH and B95 - CPP piping view from Elev. +14.00 m
B63 - STH Loading Bay area view from Elev. +14.00 m
 B64 - Power train area view from North side
 B64 - Power train area view from North-East side
 B64 - ST turbine view from North-West side
 B64 - Generator area view from South-West side
 B64 - BFPT piping erection activities
B64 - Lube oil room view from Top (Elev. +14.00 m)
 B64 - Power oil room view from Top (Elev. +14.00 m)
B64 -BFWP 1 view from North-West side
 B64 -BFWP 2 Oil Skid and pipe erection activities
B64 - ST LP turbine crossover pipe view
 B63 - STH - WSC piping erection work activities
 B63 - STH - WSC piping erection work activities
B63 - STH - WSC piping erection work activities
 B01 - Boiler and WFGD area overview from North-East side
B01 - Boiler North FD Fan and PA Fan view
 B06 - Boiler Bunker Station area view from North side
 B30 - CEB Electrical Bldg. view from South-West side
 B30 - CEB Electrical Bldg. North side HVAC equipment installation activities
 B35 - BEB Electrical Bldg. West side area civil work activities
B68 - Transformer area South side underground civil work activities
F05 - 230 kV Switchyard HV cable pulling activities
 B07 - ESP view from South-West side
B07 - ESP view from North-East side
 B17 - Flue Gas Ducts structure erection activities
B17 - Flue Gas Ducts structure erection activities
B17 - Flue Gas Ducts structure erection activities
WFGD area view from North side
WFGD area view from East side
 L04 - WFGD Pumping Station Bldg. area view from West side
 L04 - WFGD Pumping Station Bldg. view from North-East side
L06 - WFGD Electrical Bldg. view from North-West side
L06 - WFGD Electrical Bldg. rooftop equipment installation activities
L07 - WFGD Service Bldg. roof sheeting erection activities
 L36 - WFGD SRS and L07 - Service Bldg. area view from South-East side
L07 - WFGD Service Bldg. ground floor area view
L09 - WFGD Auxiliary Storage Tank view from South-West side 
L24 - WFGD Ducts view from South-East side
 L24 - WFGD Ducts and L09 - Aux. Storage Tank view from Top L05 - Absorber / Reactor Tower
L05 - Absorber / Reactor Tower Emergency Quenching Tank installation activities
 L05 - Absorber / Reactor Tower Hydro-Cyclone installation activities
 C01 - Fuel Oil Storage Tank area view from South-West side
 C01 - Fuel Oil Storage Tank pipe erection activities
C01 - Fuel Oil Storage Tank area civil drain work & pipe erection activities
C03 - Fuel Oil Pump Station pipe erection activities
C06 - Coal Conveyors structure view from North-East side
C06 - Coal Conveyors module structure pre-assembly view
C07 - Coal Transfer Tower structure view from North-East side
 C07 - Coal Transfer Tower structure and G33 - Used Water Reservoir area view from South-East side
 C06 - Coal Conveyors and H03 - Piperack view from B63 - STH
H03 - Piperack towards B07 - ESP area view from East side
H03 - Piperack towards B07 - ESP area view from West side
 G06 - Demin. Effluent Neutralization Bldg. view from South-East side
 G02a - Filtrate Water Tank view from South-East side
 G07 - Demin. Water Storage Tank area view from South-East side
G06 - Demin. Effluent Neutralization Bldg. North side pipe erection activities
G07 - Demin. Water Storage Tank area pipe erection activities
G20 - Drinking Water Tank area pipe erection activities
 G42 - Fire Fighting Pumping Bldg. area view from East side
Auxiliary Steam piperack crossing from existing EGAT plant view