14 November, 2017

14-11-17

B63 - STH view from West side
B63 - STH North side cooling water pipe erection activities
B01 - Boiler Submerged Scrapper Conveyor foundation view
B01 - Boiler Slag Conveyor civil work activities
B01 - Boiler North side pipe erection activities
B01 - Boiler North FD Fan and PA Fan view
B06 - Boiler Coal Bunker Station view from North side
B30 - CEB Electrical Bldg. area view from South-West side
B30 - CEB Electrical Bldg. Programming room console installation activities
B30 - CEB Electrical Bldg. main control room view
B30 - CEB Electrical Bldg. meeting room HVAC ducts installation activities
F05 - 230 kV HV Switchyard area view from B30 - CEB Electrical Bldg.
F05 - 230 kV HV Switchyard view from South side
F05 - 230 kV HV Switchyard cable pulling activities
B07 - ESP 1 view from North-East side
B07 - ESP 1 North side insulation erection activities
B07 - ESP pipe erection activities
B17 - Flue Gas Ducts & structure erection activities
WFGD area view from North side
L04 - WFGD Pumping Station Bldg. view from North-East side
L04 - WFGD Pumping Station Bldg. view from West side
L06 - WFGD Electrical Bldg. view from North-West side
L05 - WFGD Absorber / Reactor Tower view from East side
L38 - WFGD Local Gypsum Slurry Tank view from North-East side
L24 - WFGD ducts seal fan installation activities
C01 - Fuel Oil Storage Tank area view from B30 - CEB Electrical Bldg.
C01 - Fuel Oil Storage Tank pipe erection activities
C01 - Fuel Oil Storage Tank area view from North-East side
G10 - Emergency Diesel Generator area view from B30 - CEB Electrical Bldg.
C03 - Fuel Oil Pump Station view from North side
G08 - Compressor Air Bldg. area fencing erection activities
D06 - Ash Transfer Tower structure erection activities
D01 - Fly Ash Silo Storage Tank area view from East side
D01 - Fly Ash Silo Storage Tank and D09 - Weighing Bridge area view from North-East side
D23 - Ash Receiving Station foundation area view
Temporary back-filling for Coal Conveyors module erection area view
D08 - Fly Ash Sub-Distribution Bldg. area view from South-East side
D08 - Fly Ash Sub-Distribution Bldg. area view from South-West side
D20 - Fly Ash Comp. Air Bldg. area view from West side
C08 - Lignite Sub-Distribution Bldg. and C06 - Coal Conveyors structure area view from East side
C08 - Lignite Sub-Distribution Bldg. panels installation activities
G11 - Boiler Fire Fighting Pumping House civil work activities
B07 - ESP 1 North side and H03 - Piperack area civil work activities
B94 - Air Pre-Heater Washing Basin area view from North-West side
G60 - Chemical Bulk Storage Bldg. and G32 - Neutralization Basin area civil work activities
C06 - Coal Conveyors and H03 - Piperack view from South-East side
C06 - Coal Conveyors structure view from West side
C06 - Coal Conveyors structure erection activities
C07 - Coal Transfer Tower #3 erection activities
C07 - Coal Transfer Tower #3 erection activities
H03 - Piperack towards B07 - ESP structure erection activities
Auxiliary Steam piperack crossing from existing EGAT plant view

No comments:

Post a Comment