28 February, 2018

28-02-18

Plant North side area view from B01 - Boiler
F05 - HV 230 kV Switchyard area view from B01 - Boiler
B01 - Boiler area view from South-East side
B01 - Boiler Submerged Scrapper Conveyors area view
B01 - Boiler Submerged Scrapper Conveyors belt roller installation
B01 - Boiler Ammonia pipe insulation installation
B01 - Boiler pipe insulation installation
B01 - Boiler pipe insulation installation
B01 - Boiler Sooth blower view
B01 - Boiler pipe cladding installation
B01 - Boiler pipe insulation & cladding installation
B01 - Boiler furnace area electrical panel testing activities
B01 - Boiler top walkway platform repair work activities
B06 - Boiler Coal Bunker ducts insulation support pins installation
B06 - Boiler Coal Bunker tripper deck car & belt roller erection activities
B06 - Boiler Coal Bunker tripper deck car erection activities
B06 - Boiler Coal Bunker tripper deck connection from C07 - Transfer Tower #4 conveyors installation
B06 - Boiler Coal Bunker tripper deck connection from C07 - Transfer Tower #4 funnel installation
B06 - Boiler Coal Bunker tripper deck connection from C07 - Transfer Tower #4 conveyors roller installation
B06 - Boiler Coal Bunker tripper deck connection from C07 - Transfer Tower #4 conveyors view
B35 - BEB Electrical Bldg. roof fans view from B01 - Boiler
B07 - ESP area view from South-East side
B07 - ESP view from B01 - Boiler
B07 - ESP 1 area view from B01 - Boiler
B07 - ESP 2 area view from B01 - Boiler
B17 - Flue Gas Ducts connection dampers insulation & cladding installation
B17 - Flue Gas Ducts connection to B07 - ESP 2 erection activities
WFGD North-West side view from B01 - Boiler
WFGD South-West side view from B01 - Boiler
WFGD area view from South-East side
WFGD area view from South-West side
L04 - WFGD Pumping Bldg. view from B01 - Boiler
L24 - WFGD Ducts view from South side
G11 - Boiler Firefighting Pump House and D07 - Slag Conveyors view from B01 - Boiler
B94 - Air Pre-Heater Washing Basin area view from B01 - Boiler
C01 - Fuel Oil Storage Tank view from B01 - Boiler
Auxiliary Steam piperack crossing pipe erection activities
C06 - Coal Conveyors and H03 - Piperack view from B01 - Boiler
C06 - Coal Conveyors and H03 - Piperack view from B01 - Boiler
D01 - Fly Ash Silo Storage Tank and D06 - Ash Transfer Tower view from B01 - Boiler
D01 - Fly Ash Silo Storage Tank view from B01 - Boiler
D01 - Fly Ash Silo Storage Tank erection activities
D06 - Ash Transfer Tower and D07 - Ash Slag Conveyors view from B01 - Boiler
D06 - Ash Transfer Tower towards D01 - Fly Ash Silo Storage Tank conveyors erection activities
D30 - Ash Loading Station and L12 - Gypsum Conveyors view from B01 - Boiler
D30 - Ash Loading Station and L12 - Gypsum Conveyors view from B01 - Boiler
L15 - Gypsum Transfer Tower towards L07 - WFGD Service Bldg. conveyors erection activities
C07 - Transfer Tower #4 view from B01 - Boiler
C07 - Transfer Tower #4 equipment erection activities
C07 - Transfer Tower #3 view from B01 - Boiler
E07 - Cooling Tower Electrical Bldg. area view from South-West side
G05 - Demineralization Bldg. area view form B01 - Boiler
Acid Cleaning temporary collecting pond area view from B01 - Boiler
Plant South side of Switchyard area road work activities
Plant South side of STH area road work activities
Plant South side of Boiler area road work activities
Plant South side of ESP & WFGD area road work activities
Plant South side temporary lay-down area view from B01 - Boiler