14 February, 2018

14-02-18

Plant view from South-East side
B89 - Compressed Gas Storage House view from South-East side
B95 - CPP Bldg. view from South-West side
F05 - HV 230 kV Switchyard area view from B01 - Boiler
B01 - Boiler Submerged Scrapper Conveyors area view
B01 - Boiler Sump Pit area view
B01 - Boiler Slag Conveyors rollers installation
B01 - Boiler Seal Air Fans equipment view
B01 - Boiler Sooth blower cable pulling activities
B01 - Boiler ducts insulation activities
B01 - Boiler pipe insulation activities
B01 - Boiler ducts insulation activities
B01 - Boiler ducts insulation activities
B06 - Boiler Coal Bunker pulverizer equipment view
B06 - Boiler Coal Bunker tripper deck connection from C07 - Transfer Tower #4 conveyors support erection
B06 - Boiler Coal Bunker tripper deck rollers installation
B06 - Boiler Coal Bunker tripper deck rail installation
B07 - ESP view from B01 - Boiler
B07 - ESP 1 area view from B01 - Boiler
B17 - Flue Gas Ducts towards B07 - ESP 1 insulation activities
B07 - ESP 2 area view from B01 - Boiler
B17 - Flue Gas Ducts towards B07 - ESP 2 view from B01 - Boiler
WFGD North-West side view from B01 - Boiler
WFGD South-West side view from B01 - Boiler
L05 - WFGD Absorber / Reactor Tower area view from B01 - Boiler
C01 - Fuel Oil Storage Tank view from B01 - Boiler
Auxiliary Steam piperack crossing pipe erection activities
G11 - Boiler Firefighting Pump House and D07 - Slag Conveyors view from B01 - Boiler
D01 - Fly Ash Silo Storage Tank and D06 - Ash Transfer Tower view from B01 - Boiler
D01 - Fly Ash Silo Storage Tank view from B01 - Boiler
D01 - Fly Ash Silo Storage Tank erection activities
D06 - Ash Transfer Tower and D07 - Slag Conveyors structure erection activities
D23 - Ash Receiving Station and D30 - Ash Loading Station view from B01 - Boiler
B94 - Air Pre-Heater Washing Basin area view from B01 - Boiler
C06 - Coal Conveyors and H03 - Piperack view from B01 - Boiler
C06 - Coal Conveyors and H03 - Piperack view from B01 - Boiler
C06 - Coal Conveyors and H03 - Piperack view from B01 - Boiler
L12 - Gypsum Conveyors and L15 - Gypsum Transfer Tower view from B01 - Boiler
C07 - Transfer Tower #4 view from B01 - Boiler
K4 - Guard House civil work activities
Acid Cleaning temporary collecting pond view from B01 - Boiler
Plant West side of Switchyard area road work activities
Plant South side of Switchyard area road work activities
Plant South side of Transformer area road work activities
Plant South side of STH area road work activities
Plant South side of Boiler area road work activities
Plant North side of B89 - Comp. Gas Storage House area road work activities
Plant South side of ESP area road work activities
Plant South side of Boiler area road work activities
Plant South side of STH area road work activities