06 February, 2018

06-02-18

Plant view from South-West side
B01 - Boiler Scrapper Conveyor area furnace wall insulation activities
B01 - Boiler Seal Air Fans pipe erection activities
B01 - Boiler downcomer pipe insulation activities
B01 - Boiler Sooth blowers pipe area view
B01 - Boiler Ammonia injection pipe area view
B01 - Boiler furnace wall insulation activities
B06 - Boiler Coal Bunker feeder equipment view
B06 - Boiler Coal Bunker Tripper Deck rail from C06 - Coal Conveyors structure erection activities
B06 - Boiler Coal Bunker Tripper Deck rail erection activities
B06 - Boiler Coal Bunker Tripper Deck rail erection activities
B07 - ESP and B17 - Flue Gas Ducts view from B01 - Boiler
B07 - ESP view from South-West side
B17 - Flue Gas Ducts towards B07 - ESP 1 view from B01 - Boiler
B17 - Flue Gas Ducts towards B07 - ESP 1 ducts insulation installation
B17 - Flue Gas Ducts towards B07 - ESP 2 view from B01 - Boiler
B17 - Flue Gas Ducts towards B07 - ESP 2 ducts erection activities
WFGD North-West side view from B01 - Boiler
WFGD South-West side view from B01 - Boiler
L04 - WFGD Pumping Building West side view from B01 - Boiler
C01 - Fuel Oil Storage Tank painting work activities
Auxiliary Steam piperack crossing pipe erection activities
D01 - Fly Ash Silo Storage Tank erection activities
D06 - Ash Transfer Tower structure erection activities
D07 - Slag Conveyor module structure erection activities
D23 - Ash Receiving Station and D30 - Ash Loading Station bridge conveyors erection activities
C06 - Coal Conveyors and H03 - Piperack view from B01 - Boiler
C06 - Coal Conveyors and L12 - Gypsum Conveyors view from B01 - Boiler
C06 - Coal Conveyors and H03 - Piperack view from B63 - STH
C06 - Coal Conveyors and H03 - Piperack view from B01 - Boiler
C07 -Transfer Tower #4 view from B01 - Boiler
C07 -Transfer Tower #4 view from B01 - Boiler
C07 -Transfer Tower #3 view from B01 - Boiler
Acid Cleaning temporary collecting pond area view
Plant South-West side of Switchyard area road work activities
Plant South side of Switchyard area drainage work activities