Plant view from North-West side 
B63 - STH area view from South-East side 
B63 - STH area view from North-East side 
B63 - STH West side wall cladding erection activities 
B63 - STH West side staircase structure erection activities 
B01 - Boiler Submerged Scrapper Conveyor area view 
B01 - Boiler Slag Conveyor view from East side
B01 - Boiler Seal Air Fans pipe insulation installation 
B01 - Boiler North FD Fans & PA Fans area view  
B01 - Boiler LP Start-Up pumps pipe erection activities 
B01 - Boiler Water Canon Pump Skid pipe erection activities 
B02 - Stack CEMS equipment installation 
B02 - Stack CEMS equipment installation 
B06 - Boiler Coal Bunker Station view from North side 
B06 - Boiler Coal Bunker Station view from South side 
B30 - CEB Electrical Bldg. view from South-West side 
B30 - CEB Electrical Bldg. corridor area view 
B30 - CEB Electrical Bldg. Main Control room view
B30 - CEB Electrical Bldg. Main Control room view
B30 - CEB Electrical Bldg. server room view 
B30 - CEB Electrical Bldg. Meeting room view 
B30 - CEB Electrical Bldg. Meeting room balcony area civil work activities 
B30 - CEB Electrical Bldg. elevator area view 
B35 - BEB Electrical Bldg. electrical panels view 
B35 - BEB Electrical Bldg. electrical panels cable termination activities 
B68 - Transformer area view from B30 - CEB Electrical Bldg. 
B68 - Transformer area view from South side 
B68 - Transformer area firefighting pipe painting activities
B68 - Transformer area view from North side
F05 - HV 230 kV Switchyard area view from B30 - CEB Electrical Bldg.
B07 - ESP 1 ducts insulation & cladding installation
B17 - Flue Gas Ducts towards B07 - ESP 1 ducts insulation & cladding erection activities
B95 - CPP Bldg. view from South-West side
L04 - WFGD Pump Bldg. wall cladding installation
L04 - WFGD Pump Bldg. wall cladding installation
L06 - WFGD Electrical Bldg. view from North-West side
L06 - WFGD Electrical Bldg. electrical panel view 
L06 - WFGD Electrical Bldg. electrical panel cable termination activities
L06 - WFGD Electrical Bldg. battery room equipment installation
L06 - WFGD Electrical Bldg. electrical panel cable termination activities
L06 - WFGD Electrical Bldg. cable pulling activities
L06 - WFGD Electrical Bldg. cable pulling activities
L24 - WFGD Ducts view from South-East side
C01 - Fuel Oil Storage Tank area view from West side
C01 - Fuel Oil Storage Tank area view from North side
C01 - Fuel Oil Storage Tank view from B30 - CEB Electrical Bldg.
G10 - Emergency Diesel Generator area view from B30 - CEB Electrical Bldg.
C03 - Fuel Oil Pump Station pipe hydrotest activities
Auxiliary Steam piperack crossing pipe erection activities
Auxiliary Steam piperack crossing pipe erection activities
G08 - Compressed Air Production Bldg. equipment view
G08 - Compressed Air Production Bldg. equipment view
G11 - Boiler Firefighting Pump House civil work activities
G32 - Neutralization Basin civil work activities
B94 - Air Pre-Heaters Washing Basin civil work activities
D01 - Fly Ash Silo Storage Tank erection activities
D01 - Fly Ash Silo Storage Tank erection activities
D06 - Ash Transfer Tower structure erection activities
D06 - Ash Transfer Tower structure erection activities
D07 - Slag Conveyors module roller erection activities
D23 - Ash Receiving Station view from South-West side
D23 - Ash Receiving Station view from South-East side
D23 - Ash Receiving Station area Fuel Oil pipe view
D30 - Ash Loading Station view from North-West side
D30 - Ash Loading Station view from North-East side
D08 - Fly Ash Sub-Distribution Bldg. view from North-East side
D20 - Fly Ash Compressor Bldg. view from North-East side
C08 - Lignite Sub-Distribution Bldg. view from North-East side
C08 - Lignite Sub-Distribution Bldg. view from South-West side
C06 - Coal Conveyors and H03 - Piperack view from South-East side
C06 - Coal Conveyors view from North-East side
L15 - Gypsum Transfer Tower structure erection activities
L15 - Gypsum Transfer Tower and L12 - Gypsum Conveyors module structure erection activities
L12 - Gypsum Conveyors module structure erection activities
G42 - Fire Fighting Pump Station and C07 - Transfer Tower #3 area view from East side
G05 - Demineralization Bldg. view from South-East side
G06 - Demineralized Effluents Neutralization Bldg. view from East side
G02a - Demineralized Filtrate Water Tank view from South-East side
G05 - Demineralized Water Pumps area view
G07 - Demineralized Water Storage tank area view from North-East side
G20 - Demineralized Drinking Water Storage tank painting activities
Tie-in point of Service Raw Water connection area view at EGAT existing plant  
K4 - Guard House civil work activities 
Plant South-West side of Switchyard area road work activities 
Plant West side of Switchyard area road work activities 
Plant West side of Switchyard area road work activities 
Plant North side of Switchyard area road work activities 
Plant South side of STH area road & drainage work activities 
Plant South side of Boiler area road & drainage work activities 
Plant South side of Boiler area road & drainage work activities 
Plant South side of ESP area road work activities 
Plant South side of ESP area road & drainage work activities 
Plant South-East side of WFGD area underground fire fighting pipe installation activities 
Plant West side of Cooling Water Electrical Bldg. area drainage work activities 
Plant East side of WFGD area underground fire fighting pipe installation activities 
No comments:
Post a Comment