Plant view from North-West side
Plant view from West side
Plant view from South-West side
B63 - STH West side staircase structure erection activities 
B01 - Boiler view from South-East side
B01 - Boiler South PA and FD Fans area view 
B01 - Boiler South PA and FD Fan view 
B01 - Boiler North ID Fan A area view 
B07 - ESP area view from South-East side 
B07 - ESP area view from South-West side 
B07 - ESP 1 ducts insulation & cladding installation 
B07 - ESP 1 ducts insulation & cladding installation 
B07 - ESP 1 ducts insulation & cladding installation 
B07 - ESP 1 penthouse structure erection activities 
B07 - ESP 2 view from South side 
B07 - ESP 2 ducts erection activities 
B07 - ESP 2 South side pipe sleepers civil work activities 
WFGD view from South-East side 
L04 - WFGD Pump Bldg. wall cladding installation 
L05 - WFGD Absorber / Reactor Tower area view from East side 
L05 - WFGD Absorber / Reactor Tower Dewatering Hydrocyclone equipment
L05 - WFGD Absorber / Reactor Tower Emergency Quenching Water Tank pipe erection activities
L06 - WFGD Electrical Bldg. and L07 - Service Bldg. area view from L05 - Absorber / Reactor Tower 
L06 - WFGD Electrical Bldg. view from L05 - Absorber / Reactor Tower 
L07 - WFGD Service Bldg. view from L05 - Absorber / Reactor Tower 
L09 - WFGD Auxiliary Storage Tank water filling for leak test activities 
L10 - WFGD Booster Fans view from East side 
L24 - WFGD Ducts area view from South side 
L24 - WFGD Ducts view from L05 - Absorber / Reactor Tower 
L24 - WFGD Ducts insulation activities 
L24 - WFGD Ducts view from South-West side 
L37 - WFGD Purge Tank and L35 - Washing Water Tank view from North side
L38 - WFGD  Local Gypsum Slurry Tank view from East side
C01 - Fuel Oil Storage Tank view from South-West side 
C01 - Fuel Oil Storage Tank area view from North-East side 
Auxiliary Steam piperack crossing pipe erection activities
Auxiliary Steam piperack crossing pipe erection activities
G11 - Boiler Firefighting Pump House civil work activities 
G32 - Neutralization Basin civil work activities 
B94 - Air Pre-Heater Washing Basin civil work activities 
B94 - Air Pre-Heater Washing Basin civil work activities 
D01 - Fly Ash Silo Storage Tank erection activities 
D01 - Fly Ash Silo Storage Tank erection activities 
D06 - Ash Transfer Tower West side civil work activities
D06 - Ash Transfer Tower structure erection activities
D23 - Ash Receiving Station and D30 - Ash Loading Station view from L05 - Absorber / Reactor Tower 
D23 - Ash Receiving Station view from South-West side 
D30 - Ash Loading Station view from North-West side 
D30 - Ash Loading Station view from East side 
D08 - Fly Ash Sub-Distribution Bldg. view from South-East side
C06 - Coal Conveyors and H03 - Piperack view from L05 - WFGD Absorber / Reactor Tower
C06 - Coal Conveyors and H03 - Piperack view from South-East side
C07 - Transfer Tower #4 view from L05 - WFGD Absorber / Reactor Tower
L12 - Gypsum Conveyors view from East side
L15 - Gypsum Transfer Tower structure erection activities
L15 - Gypsum Transfer Tower area view from L05 - Absorber / Reactor Tower
H03 - Piperack towards B07 - ESP view from East side
Acid Cleaning temporary collecting pond area view 
Plant West side of Switchyard area road work activities 
Plant North side of Switchyard area road work activities 
Plant South side of Switchyard area road work activities 
Plant South side of ESP area road work activities 
Plant South side of WFGD area road work activities 
Plant South side of Boiler area drainage civil work activities 
Plant South side of ESP area drainage civil work activities 
Plant South side of ESP area drainage civil work activities 
Plant South side of WFGD area underground fire fighting pipe installation activities 
Plant East side of WFGD area underground fire fighting pipe installation activities