13 February, 2018

13-02-18

Plant view from North-West side
Plant view from West side
Plant view from South-West side
B63 - STH West side staircase structure erection activities
B01 - Boiler view from South-East side
B01 - Boiler South PA and FD Fans area view
B01 - Boiler South PA and FD Fan view
B01 - Boiler North ID Fan A area view
B07 - ESP area view from South-East side
B07 - ESP area view from South-West side
B07 - ESP 1 ducts insulation & cladding installation
B07 - ESP 1 ducts insulation & cladding installation
B07 - ESP 1 ducts insulation & cladding installation
B07 - ESP 1 penthouse structure erection activities
B07 - ESP 2 view from South side
B07 - ESP 2 ducts erection activities
B07 - ESP 2 South side pipe sleepers civil work activities
WFGD view from South-East side
L04 - WFGD Pump Bldg. wall cladding installation
L05 - WFGD Absorber / Reactor Tower area view from East side
L05 - WFGD Absorber / Reactor Tower Dewatering Hydrocyclone equipment
L05 - WFGD Absorber / Reactor Tower Emergency Quenching Water Tank pipe erection activities
L06 - WFGD Electrical Bldg. and L07 - Service Bldg. area view from L05 - Absorber / Reactor Tower
L06 - WFGD Electrical Bldg. view from L05 - Absorber / Reactor Tower
L07 - WFGD Service Bldg. view from L05 - Absorber / Reactor Tower
L09 - WFGD Auxiliary Storage Tank water filling for leak test activities
L10 - WFGD Booster Fans view from East side
L24 - WFGD Ducts area view from South side
L24 - WFGD Ducts view from L05 - Absorber / Reactor Tower
L24 - WFGD Ducts insulation activities
L24 - WFGD Ducts view from South-West side
L37 - WFGD Purge Tank and L35 - Washing Water Tank view from North side
L38 - WFGD  Local Gypsum Slurry Tank view from East side
C01 - Fuel Oil Storage Tank view from South-West side
C01 - Fuel Oil Storage Tank area view from North-East side
Auxiliary Steam piperack crossing pipe erection activities
Auxiliary Steam piperack crossing pipe erection activities
G11 - Boiler Firefighting Pump House civil work activities
G32 - Neutralization Basin civil work activities
B94 - Air Pre-Heater Washing Basin civil work activities
B94 - Air Pre-Heater Washing Basin civil work activities
D01 - Fly Ash Silo Storage Tank erection activities
D01 - Fly Ash Silo Storage Tank erection activities
D06 - Ash Transfer Tower West side civil work activities
D06 - Ash Transfer Tower structure erection activities
D23 - Ash Receiving Station and D30 - Ash Loading Station view from L05 - Absorber / Reactor Tower
D23 - Ash Receiving Station view from South-West side
D30 - Ash Loading Station view from North-West side
D30 - Ash Loading Station view from East side
D08 - Fly Ash Sub-Distribution Bldg. view from South-East side
C06 - Coal Conveyors and H03 - Piperack view from L05 - WFGD Absorber / Reactor Tower
C06 - Coal Conveyors and H03 - Piperack view from South-East side
C07 - Transfer Tower #4 view from L05 - WFGD Absorber / Reactor Tower
L12 - Gypsum Conveyors view from East side
L15 - Gypsum Transfer Tower structure erection activities
L15 - Gypsum Transfer Tower area view from L05 - Absorber / Reactor Tower
H03 - Piperack towards B07 - ESP view from East side
Acid Cleaning temporary collecting pond area view
Plant West side of Switchyard area road work activities
Plant North side of Switchyard area road work activities
Plant South side of Switchyard area road work activities
Plant South side of ESP area road work activities
Plant South side of WFGD area road work activities
Plant South side of Boiler area drainage civil work activities
Plant South side of ESP area drainage civil work activities
Plant South side of ESP area drainage civil work activities
Plant South side of WFGD area underground fire fighting pipe installation activities
Plant East side of WFGD area underground fire fighting pipe installation activities