Boiler steel erection (400T crane) - View from South East
Boiler steel erection (tower crane & 250 T crane) - View Form North East
Boiler Air preheater area / ESP duct fondation & UG ductbanks
Stack slip form progressing (10cm/hour up to 25 m heigth cold joint stop)
Stack slip form - Inside view
Cooling Water Pipes erection continues