23 February, 2016

23.02.16

 Boiler steel erection (400T crane) - View from South East
 Boiler steel erection (tower crane & 250 T crane) - View Form North East
 Boiler Air preheater area / ESP duct fondation & UG ductbanks
Stack slip form progressing (10cm/hour up to 25 m heigth cold joint stop) 
 Stack slip form - Inside view 
 Cooling Water Pipes erection continues