02 December, 2017

02-12-17

B01 - Boiler and B07 - ESP area view from South side
B07 - ESP area view from South-West side
WFGD area view from East side
L06 - WFGD Electrical Bldg. West side area view from L05 - WFGD Absorber / Reactor Tower
L05 - WFGD Absorber / Reactor Tower view from L06 - WFGD Electrical Bldg.
L05 - WFGD Absorber / Reactor Tower Quenching Water Tank view
L05 - WFGD Absorber / Reactor Tower Hydrocyclone installation activities
L06 - WFGD Electrical Bldg. view from L05 - WFGD Absorber / Reactor Tower
L06 - WFGD Electrical and L07 - WFGD Service Bldg. view from L05 - WFGD Absorber / Reactor Tower
L07 - WFGD Service Bldg. view from L05 - WFGD Absorber / Reactor Tower
L07 - WFGD Service Bldg. Gypsum storage floor area view
L07 - WFGD Service Bldg. ground floor tanks view
L07 - WFGD Service Bldg. Vacuum pump pipe installation activities
L07 - WFGD Service Bldg. Gypsum Discharge conveyors erection activities
L07 - WFGD Service Bldg. Gypsum Vacuum conveyors erection activities
L24 - WFGD Ducts area view from South-East side
L24 - WFGD Ducts insulation installation activities
L24 - WFGD Ducts view from L06 - WFGD Electrical Bldg.
L24 - WFGD Ducts view from L05 - WFGD Absorber / Reactor tower
Plant South side of Boiler area underground drain pipe installation activities
Plant South side of WFGD area underground drain pipe installation activities

No comments: