Plant view from North-West side
Plant view from West side
Plant view from South-West side
B63 - STH West side wall cladding erection activities
B63 - STH area view from South-West side
B63 - STH area view from South-East side
B63 - STH North side wall cladding erection activities
B63 - STH West side area civil work activities
B01 - Boiler area view from South-East side
B01 - Boiler Slag Conveyor support structure erection activities
B01 - Boiler North FD Fans & PA Fans view
B06 - Boiler Coal Bunker Station view from South side
B06 - Boiler Coal Bunker Station view from North side
B01 - Boiler and B07 - ESP area view from South side
B30 - CEB Electrical Bldg. area view from South-West side
B30 - CEB Electrical Bldg. area view from South side
B30 - CEB Electrical Bldg. Programming room view
B30 - CEB Electrical Bldg. Main Control server room view
B30 - CEB Electrical Bldg. Main Control room view
B30 - CEB Electrical Bldg. meeting room view
F05 - 230 kV HV Switchyard area view from B30 - CEB Electrical Bldg.
B07 - ESP area view from South-East side
B07 - ESP 2 insulation & cladding erection activities
B07 - ESP 2 South side pipe sleepers civil work activities
B07 - ESP 1 view from North-East side
B17 - Flue Gas Ducts and B07 - ESP 2 view from South-West side
WFGD view from South-East side
WFGD view from North side
WFGD view from East side
L04 - WFGD Pump Bldg. view from North-East side
L05 - WFGD Absorber / Reactor Tower view from East side
L06 - WFGD Electrical Bldg. view from North-West side
L06 - WFGD Electrical Bldg. view from South side
L07 - WFGD Service Bldg. ground floor tanks view
L07 - WFGD Service Bldg. Gypsum storage floor area view
L09 - WFGD Auxiliary Storage Tank view from South-West side
L10 - WFGD Booster Fans platform erection activities
L24 - WFGD Ducts area view from South-East side
L24 - WFGD Ducts area view from South-West side
L24 - WFGD Ducts underground cable pit civil work activities
L36 - WFGD SRS and L07 - Service Bldg. view from South-East side
C01 - Fuel Oil Storage Tank area view from West side
C01 - Fuel Oil Storage Tank area view from B30 - CEB Electrical Bldg.
G10 - Emergency Diesel Generator area view from B30 - CEB Electrical Bldg.
C03 - Fuel Oil Pump Station area view from North side
G08 - Compressed Air Production Bldg. area view from North-West side
Auxiliary Steam piperack crossing pipe erection activities
Auxiliary Steam piperack crossing from existing EGAT plant view
G11 - Boiler Fire Fighting Pumping House civil work activities
G28 - Oil & Fire Fighting Water Recovery Pit area civil work activities
G60 - Chemical Bulk Storage Bldg. and G32 - Neutralization Basin area civil work activities
B94 - Air Pre-Heater Washing Basin area civil work activities
D01 - Fly Ash Silo Storage Tank erection activities
D06 - Ash Transfer Tower structure erection activities
D23 - Ash Receiving Station structure erection activities
D30 - Ash Loading Station structure erection activities
D08 - Fly Ash Sub-Distribution Bldg. view from South-West side
D08 - Fly Ash Sub-Distribution Bldg. view from South-East side
D20 - Fly Ash Compressed Bldg. view from South-West side
C06 - Coal Conveyors and H03 - Piperack view from South-East side
C06 - Coal Conveyors module #5 & #6 erection activities
C06 - Coal Conveyors module #3 erection activities
C06 - Coal Conveyors module #9 structure pre-assembly activities
C06 - Coal Conveyors module #8 structure pre-assembly activities
C06 - Coal Conveyors module #7 structure pre-assembly activities
H03 - Piperack towards B07 - ESP view from East side
H03 - Piperack and G42 - Fire Fighting Pump Station area view from North-West side
L12 - Gypsum Conveyors module & structure erection activities
G21 - NH3 Ammonia Storage Bldg. view from South-West side
Acid Cleaning temporary system installation activities
Acid Cleaning temporary collecting pond lining installation activities
Plant East side of WFGD area underground drain pipe installation activities
Plant East side of WFGD area underground drain pipe installation activities
Plant South side of WFGD area underground drain pipe installation activities
Plant South side of WFGD area underground fire fighting pipe installation activities
Plant South side of WFGD area underground fire fighting pipe installation activities
Plant South side of WFGD area underground fire fighting pipe installation activities
Plant South side of ESP area underground fire fighting pipe erection activities
Plant South side of ESP area underground fire fighting pipe erection activities
K04 - Guard House civil work activities
No comments:
Post a Comment