04 December, 2017

04-12-17

B94 - Air Pre-Heater Washing Basin civil work activities
G60 - Chemical Bulk Storage Bldg. and G32 - Neutralization Basin area civil work activities
G28 - Oil & Fire Fighting Water Recovery Pit area civil work activities
G11 - Boiler Fire Fighting Pumping House civil work activities
B01 - Boiler and B07 - ESP area view from South side
B07 - ESP area view from South-East side
WFGD area view from North side
L24 - WFGD Duct area underground cable duct civil work activities
L04 - WFGD Pumping Bldg. view from North-East side
L05 - WFGD Absorber / Reactor Tower re-circulation pipe installation activities
L06 - WFGD Electrical Bldg. North-West side area view
L10 - WFGD Booster Fans view
L24 - WFGD Ducts view from South-East side
L24 - WFGD Ducts insulation activities
L36 - WFGD SRS Bldg. Reagents Tanks view
C01 - Fuel Oil Storage Tank area view from South-West side
C01 - Fuel Oil Storage Tank area view from North-East side
C01 - Fuel Oil Storage Tank area view
Auxiliary Steam piperack crossing from existing EGAT plant view
Auxiliary Steam piperack crossing from existing EGAT plant view
D06 - Ash Transfer Tower structure erection activities
D06 - Ash Transfer Tower structure pre-assembly activities
D23 - Ash Receiving Station structure erection activities
D23 - Ash Receiving Station structure erection activities
D30 - Ash Loading Station structure erection activities
D08 - Fly Ash Sub-Distribution Bldg. area view from South-East side
D08 - Fly Ash Sub-Distribution Bldg. electrical panel installation activities
D08 - Fly Ash Sub-Distribution Bldg. electrical room view
D08 - Fly Ash Sub-Distribution Bldg. electrical room view
C08 - Lignite Sub-Distribution Bldg. area view from South-West side
C08 - Lignite Sub-Distribution Bldg. area view from East side
C08 - Lignite Sub-Distribution Bldg. electrical panel installation activities
C08 - Lignite Sub-Distribution Bldg. electrical cable termination activities
C08 - Lignite Sub-Distribution Bldg. electrical panel view
C08 - Lignite Sub-Distribution Bldg. electrical panel cable termination activities
C08 - Lignite Sub-Distribution Bldg. electrical room view
E07 - Cooling Water Electrical Bldg.view from North-West side
E07 - Cooling Water Electrical Bldg.view from South-West side
E07 - Cooling Water Electrical Bldg. electrical panel view
E07 - Cooling Water Electrical Bldg. electrical panel cable termination activities
E07 - Cooling Water Electrical Bldg. electrical panel cable termination
C06 - Coal Conveyors and C07 - Transfer Towrer #3 structure erection activities
C06 - Coal Conveyors structure erection activities
C06 - Coal Conveyors module structure pre-assembly activities
C06 - Coal Conveyors module structure pre-assembly activities
H03 - Piperack and C06 - Coal Conveyors view from South-East side
H03 - Piperack towards B07 - ESP pipe & cable trays erection activities
H03 - Piperack towards B07 - ESP pipe & cable trays erection activities