25 December, 2017

25-12-17

Plant view from North-West side
Plant view from South-West side
Plant North side area road work activities 
B63 - STH view from South-East side
B63 - STH West side wall cladding erection activities
B63 - STH North side wall cladding erection activities
B63 - STH West side area civil work activities
B63 - STH West side area civil work activities
B63 - STH West side fire fighting deluge system installation activities
B63 - STH Loading Bay area view from Elev. +14.00 m
B63 - STH CPP pipe area view from Elev. +14.00 m
B63 - STH FW area Elev. +14.00 m view from East side
B63 - STH area Elev. +14.00 m view from West side
B64 - BFWP view from Top (Elev. +14.00 m)
B64 - ST turbine view from North side
B64 - ST turbine view from North-East side
B64 - ST turbine view from North-West side
B64 - ST turbine cable pulling & termination activities
B64 - Generator area view from South-East side
B64 - Generator protection cabinet cable termination activities
B63 - STH HP BIS Heater insulation activities
B64 - STH BFWP enclosure structure erection activities
B64 - STH BFWP 1 pipe erection activities
B64 - STH BFWP 1 pipe erection activities
B64 - STH BFWP 2 pipe erection activities
B64 - STH condenser area pipe erection activities
B63 - STH MDFWP area pipe erection activities
B63 - STH MDFWP area oil flushing activities
B63 - STH HP heaters insulation support erection activities
B63 - STH HP heaters insulation activities
B63 - STH LP heaters insulation activities
B63 - STH WSC pipe insulation activities 
B01 - Boiler view from South-East side
B01 - Boiler South side FD Fan & PA Fan view
B01 - Boiler Flash tank area pipe erection activities
B01 - Boiler Submerged Scrapper Conveyor view
B01 - Boiler Slag Conveyor support structure erection activities
B01 - Boiler Submerged Scrapper Conveyor erection activities
B01 - Boiler Startup System HPU oil flushing activities
B01 - Boiler SH Spray Valves Air Receiver tank erection activities
B01 - Boiler cable trays erection activities
B01 - Boiler furnace wall insulation installation activities
B06 - Boiler Coal Bunker Station view from South side
B06 - Boiler Coal Bunker Station view from North side
B06 - Boiler Coal Bunker Tripper Deck from C06 - Coal Conveyors support erection activities
B06 - Boiler Coal Bunker Tripper Deck support erection activities
B30 - CEB Electrical Bldg. area view from South-West side
B30 - CEB Electrical Bldg. area view from South side
B30 - CEB Electrical Bldg. Main Control room view
B30 - CEB Electrical Bldg. Main Control server room view
B30 - CEB Electrical Bldg. Main Control room corridor area view
B30 - CEB Electrical Bldg. meeting room view
B35 - BEB Electrical Bldg. area view from South side
B68 - Transformer area view from South side
B68 - Transformer area view from East side
F05 - 230 kV HV Switchyard area view from B30 - CEB Electrical Bldg.
B07 - ESP area view from South-East side
B01 - Boiler and B07 - ESP area view from South side
B07 - ESP 2 insulation erection activities
B07 - ESP 1 insulation erection activities
B07 - ESP view from B01 - Boiler
B07 - ESP 2 South side civil work activities
B17 - Flue Gas Ducts and B07 - ESP view from B01 - Boiler
B17 - Flue Gas Ducts towards B07 - ESP 2 ducts & structure erection activities
WFGD view from South-East side
WFGD view from North side
WFGD view from East side
L04 - WFGD Pump Bldg. view from North-East side
L04 - WFGD Pump Bldg. pumps enclosure erection activities
L05 - WFGD Absorber / Reactor Tower view from East side
L07 - WFGD Service Bldg. Gypsum storage floor area view
L07 - WFGD Service Bldg. ground floor tanks view
L24 - WFGD Ducts area view from South-East side
L24 - WFGD Ducts insulation & cladding installation activities
L38 - WFGD Local Gypsum Slurry Tank view from North side
C01 - Fuel Oil Storage Tank area view from B30 - CEB Electrical Bldg.
G10 - Emergency Diesel Generator area view from B30 - CEB Electrical Bldg.
C03 - Fuel Oil Pump Station roof gutter erection activities
C03 - Fuel Oil Pump Station area fire fighting deluge system hydrotest activities
G08 - Compressed Air Production area view from North-West side
G08 - Compressed Air Production area view from North-East side
Auxiliary Steam piperack crossing from existing EGAT plant view
Auxiliary Steam piperack crossing from existing EGAT plant view
G11 - Boiler Fire Fighting Pumping House civil work activities
 
D01 - Fly Ash Silo Storage Tank area view from North-East side
D06 - Ash Transfer Tower structure erection activities
D06 - Ash Transfer Tower structure erection activities
D23 - Ash Receiving Station structure erection activities
D30 - Ash Loading Station structure erection activities
G28 - Oil & Fire Fighting Water Recovery Pit area civil work activities
G60 - Chemical Bulk Storage Bldg. and G32 - Neutralization Basin area civil work activities
B94 - Air Pre-Heater Washing Basin area civil work activities
D08 - Fly Ash Sub-Distribution Bldg. view from South-East side
C06 - Coal Conveyors and H03 - Piperack view from B63 - STH
C06 - Coal Conveyors and H03 - Piperack view from South-East side
C06 - Coal Conveyors erection activities
H03 - Piperack and G42 - Fire Fighting Pump Station view from West side
H03 - Piperack towards B07 - ESP view from East side
Plant East side of WFGD area underground drain pipe installation activities
Plant East side of WFGD area underground drain pipe installation activities
Plant South side of WFGD area underground civil work activities
Plant South side of WFGD area underground fire fighting pipe installation activities
Plant South side of WFGD area underground fire fighting pipe installation activities
Plant South side of Boiler area underground drain pipe installation activities
Acid Cleaning temporary system installation activities
Acid Cleaning temporary collecting pond lining installation activities
K04 - Guard House civil work activities