19 December, 2017

19-12-17

Plant view from West side
Plant view from South-West side
B63 - STH view from South-East side
 
B63 - STH North side wall cladding erection activities
B63 - STH West side area civil work activities
B63 - STH West side area civil work activities
B63 - STH area Elev. +14.00 m view from East side
B63 - STH area Elev. +14.00 m view from West side
B63 - STH CPP pipe area view from Elev. +14.00 m
B63 - STH Loading Bay area view from Elev. +14.00 m
B63 - STH North side area Elev. +14.00 m wall cladding erection activities
B64 - BFWP view from Top (Elev. +14.00 m)
B64 - Powertrain view from North-East side
B64 - ST turbine view from North-East side
B64 - ST turbine view from North side
B64 - ST turbine view from North-West side
B64 - ST turbine tubing pressure test activities
B64 - ST turbine pipe hydrotest activities
B64 - Generator area view from South-East side
B64 - Generator instrumentation cable termination activities
B64 - Generator protection cabinet cable termination activities
B64 - STH BFWP enclosure structure erection activities
B64 - STH BFWP 1 pipe erection activities
B64 - STH BFWP 2 view
B64 - STH BFWP pipe erection activities
B63 - STH MDFWP area pipe erection activities 
B63 - STH East side area pipe erection activities
B63 - STH HP heaters insulation support installation activities
B63 - STH LP heaters insulation installation activities
B63 - STH fire fighting pipe installation activities
B63 - STH Sampling skid internal pipe erection activities
B30 - CEB Electrical Bldg. area view from South side
B30 - CEB Electrical Bldg. Programming room view
B30 - CEB Electrical Bldg. Main Control room view
B30 - CEB Electrical Bldg. meeting room view
B68 - Transformer area fencing installation activities
B68 - Transformer and B30 - CEB Electrical Bldg. area road work activities
F05 - 230 kV HV Switchyard area view from B30 - CEB Electrical Bldg.
B01 - Boiler view from South-East side
B06 - Boiler Coal Bunker Station view from South side
B06 - Boiler Coal Bunker Station view from North side
B01 - Boiler South side civil work activities
B01 - Boiler Submerged Scrapper Conveyor view
B01 - Boiler Slag Conveyor structure erection activities
B10 - Boiler ID Fan A North side view
B10 - Boiler ID Fan A cable termination work activities
B06 - Boiler Coal Bunker feeder equipment view from B63 - STH
B01 - Boiler and B07 - ESP area view from South side
B07 - ESP area view from South-West side
B07 - ESP area view from South-East side
B07 - ESP 1 insulation & cladding erection activities
B07 - ESP 2 insulation erection activities
WFGD view from South-East side
WFGD view from E04 - Cooling Tower
WFGD view from North side
L04 - WFGD Pump Bldg. view from North-East side
L04 - WFGD Pump Bldg. pumps enclosure erection activities
L06 - WFGD Electrical Bldg. view from North-West side
L05 - WFGD Absorber / Reactor Tower view from East side
L07 - WFGD Service Bldg. Gypsum storage floor area view
L07 - WFGD Service Bldg. ground floor tanks view
L09 - WFGD Auxiliary Storage tank view from South-West side
L24 - WFGD Ducts area view from South-East side
L36 - WFGD SRS Bldg. and L07 - Service Bldg. view from E04 - Cooling Tower
C01 - Fuel Oil Storage Tank area view from B30 - CEB Electrical Bldg.
C01 - Fuel Oil Storage Tank area civil work activities
G10 - Emergency Diesel Generator area view from B30 - CEB Electrical Bldg.
Auxiliary Steam pipe on piperack erection activities
Auxiliary Steam piperack crossing from existing EGAT plant view
Auxiliary Steam piperack crossing from existing EGAT plant view
G08 - Compressor Air Production Bldg. view from North-West side
G11 - Boiler Fire Fighting Pumping House civil work activities
D01 - Fly Ash Silo Storage Tank area view from North-East side
D01 - Fly Ash Silo Storage Tank erection activities
D06 - Ash Transfer Tower structure erection activities
D06 - Ash Transfer Tower structure erection activities
D23 - Ash Receiving Station structure erection activities
D30 - Ash Loading Station structure erection activities
D30 - Ash Loading Station structure erection activities
D08 - Fly Ash Sub-Distribution Bldg. area view from South-East side
D08 - Fly Ash Sub-Distribution Bldg. electrical panel installation activities
D08 - Fly Ash Sub-Distribution Bldg. electrical panel cable termination activities
D08 - Fly Ash Sub-Distribution Bldg. control room view
D20 - Fly Ash Compressor Bldg. view from West side
G28 - Oil & Fire Fighting Water Recovery Pit area civil work activities
G60 - Chemical Bulk Storage Bldg. and G32 - Neutralization Basin area civil work activities
B94 - Air Pre-Heater Washing Basin area civil work activities
H03 - Piperack and C06 - Coal Conveyors view from B63 - STH
H03 - Piperack and C06 - Coal Conveyors view from South-East side
H03 - Piperack towards B07 - ESP pipe erection activities
C06 - Coal Conveyors and C07 - Transfer Tower #3 area view
C06 - Coal Conveyors module gallery #6 pre-assembly activities
C06 - Coal Conveyors module gallery #7 pre-assembly activities
L12 - Gypsum Conveyors module pre-assembly activities
L12 - Gypsum Conveyors module structure pre-assembly activities
D07 - Slag Conveyors module pre-assembly activities
C08 - Lignite Sub-Distribution Bldg. view from South-West side
C08 - Lignite Sub-Distribution Bldg. view from South-East side
C08 - Lignite Sub-Distribution Bldg. electrical panel cable termination activities
C08 - Lignite Sub-Distribution Bldg. electrical panel view
G42 - Fire Fighting Pumping Station area view from South-East side
G42 - Fire Fighting Pumping Station view from E04 - Cooling Tower
Fire Fighting Raw Water Reservoir view from E04 - Cooling Tower
G06 - Demin. Effluent Neutralization Bldg. view from South side
E04 - Cooling Tower view from South-West side
E07 - Cooling Water Electrical Bldg.view from E04 - Cooling Tower
E07 - Cooling Water Electrical Bldg. electrical panel view
E07 - Cooling Water Electrical Bldg. electrical panel cable termination activities
E12 - Cooling Tower Pumping Station view
E12 - Cooling Tower Pumping Station and H03 - Piperack area view
 
Plant East side of WFGD area underground drain pipe installation
 
Plant East side of WFGD area underground civil work activities
Plant South side of WFGD area underground civil work activities
 
Plant South side of WFGD area underground fire fighting pipe erection activities
Plant South side of Boiler area underground drain pipe installation activities
K4 - Guard House civil work activities