21 December, 2017

21-12-17

Plant view from South-West side
B63 - STH roof top exhaust fans view from B01 - Boiler
B68 -Transformer area view from South side
F05 - 230 kV HV Switchyard area view from B01 - Boiler
B02 - Stack view from B01 - Boiler
B01 - Boiler Seal Air Booster Fan foundation civil work activities
B01 - Boiler Seal Air pipe erection activities
B01 - Boiler Slag Conveyor erection activities
B01 - Boiler Slag Conveyor support structure erection activities
B01 - Boiler BWCP erection activities
B01 - Boiler ducts insulation erection activities
B01 - Boiler furnace insulation erection activities
B01 - Boiler pipe insulation erection activities
B01 - Boiler pipe insulation erection activities
B01 - Boiler sootblower piping view
B01 - Boiler NH3 Ammonia pipe view
B01 - Boiler cable pulling activities
B06 - Boiler Coal Bunker Conveyor support erection activities
B06 - Boiler Coal Bunker Conveyor from C06 - Coal Conveyors support erection activities
B06 - Boiler Coal Bunker North side view
B06 - Boiler Coal Bunker feeder equipment view
B07 - ESP and L05 - WFGD Absorber / Reactor Tower view from B01 - Boiler
B07 - ESP 1 view from North side
B17 - Flue Gas Ducts and B07 - ESP view from B01 - Boiler
B17 - Flue Gas Ducts towards B07 - ESP 1 ducts erection activities
B17 - Flue Gas Ducts towards B07 - ESP 1 ducts & structure erection activities
WFGD North-West side view from B01 - Boiler
WFGD South-West side view from B01 - Boiler
L04 - WFGD Pump Bldg. West side view from B01 - Boiler
Auxiliary Steam piperack crossing from existing EGAT plant view
G11 - Boiler Fire Fighting Pumping House civil work activities
G21 - NH3 Ammonia Storage Station area view from B01 - Boiler
D01 - Fly Ash Silo Storage Tank erection activities
D06 - Ash Transfer Tower structure erection activities
D07 - Slag Conveyor module structure pre-assembly activities
D23 - Ash Receiving Station structure erection activities
D30 - Ash Loading Station structure erection activities
D08 - Fly Ash Sub-Distribution and D20 - Fly Ash Compressor Bldg. view from B01 - Boiler
B94 - Air Pre-Heater Washing Basin area civil work activities
G60 - Chemical Bulk Storage and G32 - Neutralization Basin area view from B01 - Boiler
H03 - Piperack towards B07 - ESP view from East side
H03 - Piperack towards B07 - ESP view from B01 - Boiler
C06 - Coal Conveyors and H03 - Piperack view from B01 - Boiler
C06 - Coal Conveyors gallery #5 and #6 module erection activities
C06 - Coal Conveyors gallery #5 and #6 module erection activities
C07 -Transfer Tower #3 view
C07 -Transfer Tower #4 view from B01 - Boiler
C07 -Transfer Tower #4 erection activities
Acid Cleaning temporary collecting pond area view
Hydro-test temporary water collecting pond area view
Plant East side of WFGD area underground drain pipe installation activities
Plant East side of WFGD area underground drain pipe installation activities