13 December, 2017

13-12-17

Plant view from West side
B63 - STH West side wall cladding erection activities
B63 - STH view from South-West side
B63 - STH view from South-East side
 
B63 - STH North side cooling water pipe erection activities
B63 - STH West side area civil work activities
B63 - STH West side area civil work activities
B63 - STH CPP pipe area view from Elev. +14.00 m
B63 - STH Loading Bay area view from Elev. +14.00 m
B63 - STH area Elev. +14.00 m view from West side
B63 - STH area Elev. +14.00 m view from East side
B63 - STH North side area Elev. +14.00 m wall cladding erection activities
B64 - BFWP view from Top (Elev. +14.00 m)
B64 - ST turbine view from North-East side
B64 - ST turbine view from North-West side
B64 - ST turbine seal oil flushing activities
B64 - Generator area view from South-East side
B64 - STH BFWP 1 view
B64 - STH BFWP 1 view
B64 - STH BFWP 2 view
B64 - STH BFWP pipe erection activities
B63 - STH MDFWP area pipe erection activities
B63 - STH area pipe HT activities
B63 - STH Basement area pipe erection activities
B63 - STH pipe erection activities
B63 - STH Basement Floor Washing Pit area pipe erection activities
B63 - STH Basement Cold Drain Pit area pipe erection activities
B63 - STH Transformer Excitation equipment installation activities
B30 - CEB Electrical Bldg. area view from South-West side
B30 - CEB Electrical Bldg. area view from South side
B30 - CEB Electrical Bldg. area view from B63 - STH
B30 - CEB Electrical Bldg. and F05 - Switchyard area road work activities
B30 - CEB Electrical Bldg. Programming room view
B30 - CEB Electrical Bldg. Main Control room view
B30 - CEB Electrical Bldg. server panels view
F05 - 230 kV HV Switchyard area view from B30 - CEB Electrical Bldg.
F05 - 230 kV HV Switchyard area civil work activities
B01 - Boiler view from South-East side
B06 - Boiler Coal Bunker Station view from South side
B06 - Boiler Coal Bunker Station view from North side
B06 - Boiler cavity area civil work activity
B01 - Boiler Submerged Scrapper Conveyor view
B01 - Boiler Slag Conveyor erection activities
B01 - Boiler sealing pipe erection activities
 
B01 - Boiler North FD Fan and PA Fan lube oil flushing activities
 
B01 - Boiler telecommunication equipment installation activities
 
B01 - Boiler and B07 - ESP area view from South side
 
B07 - ESP area view from South-East side
B07 - ESP 1 insulation erection activities
B07 - ESP 2 insulation erection activities
B07 - ESP 2 South side civil work activities
WFGD area view from South-East side
WFGD view from E04 - Cooling tower
WFGD view from East side
WFGD view from North side
L04 - WFGD Pump Bldg. view from North-East side
L04 - WFGD Pump Bldg. pumps enclosure erection activities
L05 - WFGD Absorber / Reactor Tower view from East side
L07 - WFGD Service Bldg. view from E04 - Cooling Tower
L07 - WFGD Service Bldg. Gypsum storage floor area view
L07 - WFGD Service Bldg. ground floor tanks view
L09 - WFGD Auxiliary Storage tank view from E04 - Cooling Tower
L24 - WFGD Ducts area view from South-East side
L36 - WFGD SRS Bldg. view from E04 - Cooling Tower
L36 - WFGD SRS Bldg. and L07 - Service Bldg. view from E04 - Cooling Tower
C01 - Fuel Oil Storage Tank area view from B30 - CEB Electrical Bldg.
C01 - Fuel Oil Storage Tank area civil work activities
G10 - Emergency Diesel Generator area view from B30 - CEB Electrical Bldg.
C03 - Fuel Oil Pumping Station pipe erection activities
Auxiliary Steam pipe on piperack erection activities
Auxiliary Steam piperack crossing from existing EGAT plant view
Auxiliary Steam piperack crossing from existing EGAT plant view
G11 - Boiler Fire Fighting Pumping House civil work activities
D01 - Fly Ash Silo Storage Tank area view from North-East side
D06 - Ash Transfer Tower structure erection activities
D06 - Ash Transfer Tower structure erection activities
D23 - Ash Receiving Station structure erection activities
D30 - Ash Loading Station structure erection activities
D30 - Ash Loading Station structure erection activities
D08 - Fly Ash Sub-Distribution Bldg. area view from South-East side
D08 - Fly Ash Sub-Distribution Bldg. electrical panel installation activities
D08 - Fly Ash Sub-Distribution Bldg. electrical room view
D20 - Fly Ash Compressor Bldg. view from West side
G28 - Oil & Fire Fighting Water Recovery Pit area civil work activities
G60 - Chemical Bulk Storage Bldg. and G32 - Neutralization Basin area civil work activities
B94 - Air Pre-Heater Washing Basin area civil work activities
H03 - Piperack and C06 - Coal Conveyors view from South-East side
H03 - Piperack and C06 - Coal Conveyors view from B63 - STH
H03 - Piperack area view from South-West side
C06 - Coal Conveyors module gallery #2 erection activities
C06 - Coal Conveyors module gallery #2 erection activities
C07 - Transfer Tower #3 area view
G42 - Fire Fighting Pumping Station area view from South-East side
G42 - Fire Fighting Pumping Station area view from E04 - Cooling Tower
G06 - Demin. Effluent Neutralization Bldg. area view from South side
E07 - Cooling Water Electrical Bldg.view from E04 - Cooling Tower
E07 - Cooling Water Electrical Bldg. electrical panel view
E12 - Cooling Tower Pumping Station view
Plant East side of WFGD area underground civil work activities
Plant South side of B63 - STH area civil work activities
Plant South side of Boiler area underground drain pipe installation activities
Plant South side of WFGD area underground drain pipe installation activities
Acid Cleaning temporary collecting pond area view