22 December, 2017

22-12-17

Plant North side view from EGAT existing plant unit #13
B63 - STH North side wall cladding erection activities
B01 - Boiler and C07 - Transfer Tower #4 view from EGAT existing plant unit #13
B07 - ESP view from EGAT existing plant unit #13
L05 - WFGD Absorber / Reactor Tower view from North-East side
C01 - Fuel Oil Storage Tank area view from EGAT existing plant unit #13
G08 - Compressed Air Production Bldg. view from EGAT existing plant unit #13
D01 - Fly Ash Silo Storage Tank area view from EGAT existing plant unit #13
D01 - Fly Ash Silo Storage Tank area view from North-East side
D06 - Ash Transfer Tower structure erection activities
D23 - Ash Receiving Station view from EGAT existing plant unit # 13
D23 - Ash Receiving Station structure erection activities
D23 - Ash Receiving Station structure erection activities
TP - M02 : Ash Disposal System tie-in point civil work activities
TP - M02 : Ash Disposal System tie-in point at EGAT existing plant civil work activities
TP - M09 : Fuel Oil System tie-in point at EGAT existing plant civil work activities
TP - M09 : Fuel Oil System tie-in point at EGAT existing plant civil work activities
D30 - Ash Loading Station view from EGAT existing plant unit # 13
D30 - Ash Loading Station structure erection activities
D08 - Fly Ash Sub-Distribution Bldg. area view from North-East side
D20 - Fly Ash Comp. Air Bldg. area view from North-East side
C08 - Lignite Sub-Distribution Bldg. area view from North-East side
Ash Loading and Receiving Station area view from EGAT existing plant unit #13
C06 - Coal Conveyors structure view from EGAT existing plant unit #13
C06 - Coal Conveyors structure view from North-East side
C06 - Coal Conveyors gallery #5 and #6 module erection activities
C06 - Coal Conveyors at EGAT existing plant view
C06 - Coal Conveyors gallery #7 module pre-assembly activities
C06 - Coal Conveyors gallery #4 module pre-assembly activities
L12 - Gypsum Conveyors module structure pre-assembly activities
G42 - Fire Fighting Pumping Station & C07 - Transfer Tower #3 area view from South-East side
G02a - Filtrate Water Tank view from South side
 
G05 - Demineralized Water Bldg. internal view
 
G05 - Demineralized Water Bldg. internal view
G05 - Demineralized Water Pump shelter erection activities
G05 - Demineralized Water Pump erection activities
G05 - Demineralized Water Pump pipe erection activities
G05 - Demineralized Water Bldg. electrical panel installation activities
G05 - Demineralized Water Bldg. electrical cable termination activities
G06 - Demineralized Effluent Neutralization Bldg. area view from South-East side
G07 - Demineralized Water Storage tank area view from North-East side 
Raw Water pipe tie-in at EGAT existing view
C46 - Cross Conveyors Electrical Bldg. cable termination activities
Auxiliary Steam pipe erection at existing EGAT plant unit #13
TP - M08 : Auxiliary Steam tie-in point pipe view at existing EGAT plant unit #13
TP - M08 : Auxiliary Steam tie-in point pipe view at existing EGAT plant unit #13

No comments:

Post a Comment