06 December, 2017

06-12-17

Plant view from South-West side
B63 - STH view from South-East side
B63 - STH wall cladding erection activities
G28 - Oil & F.F Recovery Pit at West B63 - STH civil work activities
B63 - STH Loading Bay area view from Elev. +14.00 m
B63 - STH CPP pipe area view from Elev. +14.00 m
B63 - STH area Elev. +14.00 m view from West side
B63 - STH FWT area Elev. +14.00 m view from East side
B64 - Powertrain area view from North-East side
B64 - ST turbine view from North side
B64 - ST turbine view from North-East side
B64 - ST turbine view from North-West side
B64 - Generator area view from South-East side
B64 - STH BFWP 1 view
B64 - STH BFWP 2 view
B64 - Lube oil room view from Top (Elev. +14.00 m)
B64 - Power oil room view from Top (Elev. +14.00 m)
B64 - BFWP view from Top (Elev. +14.00 m)
B63 - STH MDFWP area pipe erection activities
B64 - STH HP Heaters pipe installation activities
B01 - Boiler Slag Conveyor civil work activities
B01 - Boiler Submerged Scrapper Conveyor installation activities
B01 - Boiler South FD Fan and PA Fan view
B01 - Boiler LP Start-Up pumps pipe erection activities
B01 - Boiler Service Water pumps pipe erection activities
B01 - Boiler SSC Sump Pits pump installation activities
B01 - Boiler North FD Fan and PA Fan lube oil flushing activities
B01 - Boiler North FD Fan and PA Fan lube oil flushing activities
B06 - Boiler Coal Bunker Station view from South side
B06 - Boiler Coal Bunker Station view from North side
B01 - Boiler and B07 - ESP area view from South side
B07 - ESP area view from South-West side
B17 - Flue Gas Duct to ESP 1 erection activities
B30 - CEB Electrical Bldg.area view from South-West
B35 - BEB Electrical Bldg. West side civil work activities 
F05 - 230 kV HV Switchyard area drain trench civil work activities
WFGD area view from North side
L04 - WFGD Pump Bldg. view from East side
L05 - WFGD Absorber / Reactor Tower view from East side
L24 - WFGD Duct area underground cable duct civil work activities 
L35 - WFGD Washing Water Tank view from North-West side
Auxiliary Steam piperack crossing from existing EGAT plant view
D01 - Fly Ash Silo Storage Tank erection activities
D06 - Ash Transfer Tower structure erection activities
D23 - Ash Receiving Station structure erection activities
D23 - Ash Receiving Station structure erection activities
D30 - Ash Loading Station structure erection activities
G28 - Oil & Fire Fighting Water Recovery Pit area civil work activities
G60 - Chemical Bulk Storage Bldg. and G32 - Neutralization Basin area civil work activities
H03 - Piperack towards B07 - ESP pipe & cable trays erection activities
H03 - Piperack and C06 - Coal Conveyors view from B63 - STH
C06 - Coal Conveyors module structure pre-assembly activities
C06 - Coal Conveyors module structure pre-assembly activities
C06 - Coal Conveyors structure erection activities
C07 - Coal Transfer Tower #4 structure erection activities
K04 - Guard House civil work activities