Turbine Hall East side from South (CW Outlet & CEX)
Turbine Hall East side from North (CW outlet)
CW pipes backfilled North of Turbine Hall - pipe rack pedestal
Turbine Hall West side from North : CW inlet
Turbien Hall North West corner: CW inlet & TH pedestals
Central Electrical Building: excavation & pile cutting
Boiler Mills Bay before Coal silo lift today
Boiler: Hanging steel erection North side
Boiler steel Overview from North East (air preheater on the left)
Boiler steel North side: hanging steel
Boiler steel North side: hanging steel
Boiler secondary steel & staircase on the north side
Boiler PA/FD Fans backfilling South side
Boiler Mills sole plates
Boiler Mills: underground conduits to Mills (lube oil)
Boiler UG electrical pit to riser (south side)
WFGD aux Tank L09, pile cutting
Air cooling Tower pump station
Cooling Water trench to Air cooling Towers
CW pipes installation/welding (around WFGD area)
CW pipes, concrete Trust blocks poured North of B35
General View from area 7 laydowns
Conveyors civil works in existing plant
Conveyors civil works in existing plant
Conveyors civil works in existing plant
Water tanks fondations in existing plant