17 March, 2016

17.03.16






Boiler Mills Bay view from South West
Boiler Mills Bay Installation of Platforms
Boiler Air preheater structure view from back end
Boiler furnace cavity view from south
Boiler backpass area view from south
Boiler furnace cavity hanging steel view from south
Boiler Ground pre-assembly of steel structure
Boiler backpass area hanging steel view from south
 FD Fan area South electrical network 
PA Fan Foundation North
PA Fan Foundation North

Boiler Stairs and platforms in progress
 FD Fan area North electrical network
CW Pipes First Trust block North of Boiler backfilling in progress  
B35 BEB area, excavation for electrical networks 
B63 STH CW Pipe Inlet backfill 
B63 STH CW Pipe Outlet
B63 STH View from south east
B63 STH View from south west
B63 STH Pile Cap PC-G
B63 STH CW pipe Inlet area
B64 STG Pile head cutting
B63 STH CW pipe outlet area
 B30 CEB Excavation and pile Head cutting in progress
CW Pipes cofferdam excavation to pump station
CW Pipes Elbow Supporting foundation
CW Pipes cofferdam view to west 
CW Pipes second Trust block North of Boiler in progress  
E04 Cooling Tower walls north side progress
B07 ESP Area MC additional piles
L09 Emergency scrubber dump foundation pile head cutting
L38 Local gypsum slurry tank foundation pile head preparation
L35 process water tank foundation pile head preparation
L15 Gypsum transfer tower pile head preparation