29 March, 2016

29.03.16


Boiler Mills Bay view from South West 
6 of 7 Millside assembly erected onto foundation 
Second Windbox Connecting Duct erected
Boiler Steel Structure view from North 
Boiler Steel Structure view from North East 
 Boiler Air preheater structure view from back end
Boiler Furnace Cavity 
 B63 STH View to North 
B64 STG View to South Pile head preparation 
B63 STH CW Outlet Pipe welding in progress  
B63 STH View to North West   
B63 STH CW Outlet Pipe Trust Block poured 
B63 STH View to Pedestals North 
B30 CEB 
B35 BEB pile head preparation in progress 
 CW Pipe Cofferdam view to West
 CW Pipe Cofferdam view to North
 L09 Emergency scrubber dump foundation rebar in progress 
 E04 Cooling Tower view to East 
 H03 to WFGD excavation and pile head preparation
B63 STH Steel Structure on site 