31 March, 2016

31.03.16

Boiler Mills Bay view from South West
 Boiler Air preheater structure view from back end 
 Boiler Tier 3 Column installation
Furnace Hanging structure view to North 
Pressure parts beds prefabrication in progress  
 Boiler pressure part unloading  
 Boiler pressure part unloading
B63 STH View to North East 
B63  STH and B64 STG View to North 
B30 CEB View to North
 B07 - ESP Foundation excavation started
E04 Cooling Tower view to West 
  CW Pipe Cofferdam view to West
 Underground tanks area (L60/E10/G40)
 B02 stack 56,5 m height today: reached 1,7m per 12 hour shift, target of 4 to 4,5 m per 24 hour shift & target of 89 m before Songkran holiday cold joint